Corrosion Control Facility Filter Replacements FA9401-25-Q-0034
Summary
AI-generated · Aug 24, 2025Purchase and installation of Stage 1 corrosion-control facility filters for the paint booth, in accordance with permit 1770-RV3 and the manufacturer’s preventive maintenance and standard commercial practices. The contractor must provide supervision, personnel, maintenance equipment, transportation, tools, and labor to remove the existing Stage 1 filters and install the new Stage 1 filters, plus all required safety equipment; all equipment used must meet OSHA, EPA, and other applicable guidelines, and unsafe acts may be grounds for contract termination.
Amendments revise the SOW by replacing the originally listed 24 x 24 AJ Dralle ME/PT panel filter (QTY 320) with 24 x 24 ST-6 (24/Case) AJ Dralle panel filter (UOM: EA, QTY 15). They also clarify two line items: CLIN 0003 AIS - 24 x 24 ST-6 (24/Case), QTY 15; CLIN 0006 AIS - 65658 Filter Blanket (24/case): 20 x 25 x 1 inches, UOM Case, QTY 1. Quote submissions must follow the revised Combined Synopsis Solicitation instructions.
SOLICITATION AMENDED 27 JUNE 2025: The purposed of this amendment is to attach a revised version of the SOW. The original SOW included part: AJ Dralle ME/PT - 24 x 24 Panel Filter, UOM:EA QTY: 320. This part has been swapped for part: 24x24 ST-6 24/Case AJ Dralle 24 x 24 Panel Filter, UOM: EA QTY: 15. Please closely follow the instructions for quote submission on the attached and updated Combined Synopsis Solicitation. The Air Force has a requirement for the purchase and installation of corrosion control facility filters in accordance with the attached Statement of Work. The primary objective of this statement of work is to provide an outline of the Stage 1 filter change required for the Corrosion Control Facility in accordance with permit #1770-RV3 and the manufacturers recommended preventive maintenance and standard commercial practices for the paint booth with the following items. Vendor shall provide supervision, personnel, maintenance equipment, transportation, tools, and labor necessary to remove the old Stage 1 filters and install the new Stage 1 filters noted above as prescribed in this SOW. The vendor will provide all required safety equipment. All equipment used under this contract shall meet all OSHA, EPA, and any other applicable guidelines. All safety equipment must be used for its intended and designed purpose. Unsafe acts by the vendor will be reported to vendor supervision and 377 MSG and may be grounds for contract termination.
From Solicitation posted on Jun 27, 2025SOLICITATION AMENDED 27 JUNE 2025: The purposed of this amendment is to attach a revised version of the SOW. The original SOW included part: AJ Dralle ME/PT - 24 x 24 Panel Filter, UOM:EA QTY: 320. This part has been swapped for part: 24x24 ST-6 24/Case AJ Dralle 24 x 24 Panel Filter, UOM: EA QTY: 15. Please closely follow the instructions for quote submission on the attached and updated Combined Synopsis Solicitation. The Air Force has a requirement for the purchase and installation of corrosion control facility filters in accordance with the attached Statement of Work. The primary objective of this statement of work is to provide an outline of the Stage 1 filter change required for the Corrosion Control Facility in accordance with permit #1770-RV3 and the manufacturers recommended preventive maintenance and standard commercial practices for the paint booth with the following items. Vendor shall provide supervision, personnel, maintenance equipment, transportation, tools, and labor necessary to remove the old Stage 1 filters and install the new Stage 1 filters noted above as prescribed in this SOW. The vendor will provide all required safety equipment. All equipment used under this contract shall meet all OSHA, EPA, and any other applicable guidelines. All safety equipment must be used for its intended and designed purpose. Unsafe acts by the vendor will be reported to vendor supervision and 377 MSG and may be grounds for contract termination.
From Solicitation posted on Jul 03, 2025SOLICITATION AMENDED 18 JULY 2025: The purposed of this amendment is to attach a revised version of the SOW. This updated SOW clairifies the required quantity and UOM of two line items: CLIN 0003: AIS - 24 x 24 ST-6 (24/Case) AJ Dralle 24" x 24" Panel Filter UOM: Cases, QTY 15 CLIN 0006: AIS - 65658 Filter Blanket (24/case): 20" x 25" x 1" Dynabrade UOM Case, QTY 1 Please closely follow the instructions for quote submission on the attached and updated Combined Synopsis Solicitation. The Air Force has a requirement for the purchase and installation of corrosion control facility filters in accordance with the attached Statement of Work. The primary objective of this statement of work is to provide an outline of the Stage 1 filter change required for the Corrosion Control Facility in accordance with permit #1770-RV3 and the manufacturers recommended preventive maintenance and standard commercial practices for the paint booth with the following items. Vendor shall provide supervision, personnel, maintenance equipment, transportation, tools, and labor necessary to remove the old Stage 1 filters and install the new Stage 1 filters noted above as prescribed in this SOW. The vendor will provide all required safety equipment. All equipment used under this contract shall meet all OSHA, EPA, and any other applicable guidelines. All safety equipment must be used for its intended and designed purpose. Unsafe acts by the vendor will be reported to vendor supervision and 377 MSG and may be grounds for contract termination.
From Solicitation posted on Jul 18, 2025Notice history
3-
-
Solicitation Posted Jul 03, 2025No changes from previous notice
-
Solicitation LATEST Posted Jul 18, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 08, 2025 → Jul 25, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA