Control System Upgrades and Replacement Work on Tadano Infrastructure Solutions Co., Ltd. Land Portal Cranes, LC47 and LC48 at Berth 12 in the Commander Fleet Activities Yokosuka (CFAY), Japan N40084-26-B-0405
Summary
AI-generated · Mar 09, 2026Upgrade and replacement work on control systems for land portal cranes LC47 and LC48 at Berth 12, CFAY Yokosuka, Japan. Procuring and installing replacement electrical equipment, inverters, PLCs, wiring connections, and related computer software, all in accordance with the latest manufacturer standards. The contractor will be responsible for all required components and subcomponents to meet those standards.
Include inspections of conditions, cleanliness, damage, deterioration, corrosion, and proper load/unload records for applicable capacities, along with electrical connections and required location corrections. Ensure the crane area is free of debris and flammable material during and after work. Validation of designated crane conditions and capacities is required upon task order receipt. The contractor must record all work specifications and results and submit them per the SOW, restore systems to normal operation after completion, and verify overall operation and safety, prioritizing protection of personnel and property.
The purpose of this procurement is to acquire control system upgrades and replacement work on land portal cranes, LC47 and LC48 at Berth 12. The upgrades and replacement work includes but is not limited to upgrading the cranes control systems. Upgrades and replacements include: Procure and install replacement items and materials for various electrical equipment, inverters, programmable logic controllers (PLC) to include wiring connections to the replaced items, and computer software. Contractor shall be responsible for all applicable components and subcomponents to maintain accordance with the late manufacturer s standard. Inspection for all applicable components and sub-components for conditions, cleanliness, damage, defects, deterioration, corrosion, proper operating record to load/unload for applicable capacities, electrical connections, and the locations/positions correction as required, and verify the equipment location is free of debris and/or flammable material, during and/or end of the work scheduled daily and the completion of the work. Validation is required for the designated crane conditions and applicable capacities upon the receipt of task orders. Note: The Contractor shall record all operated works specifications and results, and submit it per SOW. Upon completion of above on-site works, put systems back to normal operation and check to ensure that equipment and systems are operating properly. Validate the operation/work entire area for the task order, and ensure all applicable power on/off device, on/off method, and positioned correctly before and after performing the work is the high priority for the Contractor protection in performance safety, and the site personnel/property safety.
From Sources Sought posted on Mar 05, 2026Notice history
1-
Sources Sought LATEST Posted Mar 05, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
JPN