AI-generated · Aug 24, 2025Relocate the Chancery-Annex connectivity line consisting of four 4-inch diameter metal conduits at the Natun Bazar Metro Station construction site in Baridhara. Install these conduits inside a 12-inch diameter protective mild steel pipe along their full length, perform pavement removal and reinstatement as needed, and construct pits and other necessary concrete works per the provided specifications and drawings.
The contractor must supply all materials (including metal conduits, protective pipe, reinforcing bars, cement, sand, stone chips, paving tiles), labor, tools, and equipment, unless otherwise stated in the SOW; perform all operations necessary to complete the work and remove, demolish, and dismantle existing works on the site as required. All requirements are subject to prior joint review and concurrence by the Government and the Contractor.
U S Embassy Dhaka requires a contractor to relocate Chancery-Annex connectivity line consisting of four 4-inch diameter metal conduits at Natun Bazar Metro Station construction site. Work of this contract is comprised of placing four 4-inch diameter metal conduit in a 12-inch diameter protective mild steel pipe surrounding the conduits throughout the length of the connectivity, removing the existing pavement works, and redoing the same where necessary at Natun Bazar Metro Station construction site, Baridhara, as per specifications and drawings provided, including construction of pit and other necessary concrete works. The scope of the work is described in the specifications. All materials, metal conduit pipe, protective mild steel pipe, reinforcing bar, cement, sand, stone chips, paving tiles, labor, tools and equipment shall be provided by the contractor, except otherwise mentioned in SOW and shall also perform operations necessary to complete the work as well as removing, demolishing, dismantling existing works on proposed site. All the above requirements will be based on prior joint review and concurrence by the Government and the Contractor.
From Solicitation posted on Aug 18, 2025Notice history
1-
Solicitation LATEST Posted Aug 18, 2025
Details