Summary
AI-generated · Sep 28, 2025Upgrading the airfield lighting at Wheeler Sack Army Airfield and repaving a section of the main runway. The scope covers constructing an airfield lighting vault, installing runway lighting fixtures and controls, electrical infrastructure and concrete duct banks, utilities, HVAC, airfield paving, site excavation, and restoration. All construction trades are required, and work must be performed in phases to keep mission operations ongoing, with a strong site superintendent on the project.
The contract runs for 852 calendar days with phased work. The project is subject to Project Labor Agreement requirements under Executive Order 14063, including relevant definitions and requirements in FAR clauses 52.222-33 Alt 1 and 52.222-34. Additional solicitation documents contain further information.
W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Sep 16, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Sep 18, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Sep 25, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Sep 29, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Oct 23, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Oct 29, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Nov 14, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Nov 17, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Dec 09, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Dec 22, 2025W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Feb 03, 2026W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction. This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract. Please see the attached solicitation documents for further information.
From Solicitation posted on Apr 16, 2026Notice history
12-
-
Solicitation Posted Sep 18, 2025No changes from previous notice
-
Solicitation Posted Sep 25, 2025No changes from previous notice
-
Solicitation Posted Sep 29, 2025No changes from previous notice
-
Solicitation Posted Nov 14, 2025No changes from previous notice
-
Solicitation LATEST Posted Apr 16, 2026View changes (1)
- Response Deadline: Apr 17, 2026 → May 01, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA