AI-generated · Nov 05, 2025Construct 24 concrete turning pads at Fort Lee, VA as part of a design-bid-build project, including site drainage and road alignment/repair as required. Work will proceed in three phases, with access limited to one phase at a time while the Army conducts training in the other phases. Each turning point requires excavating the existing roadbed and placing concrete per design; storm drainage must be provided to maintain positive drainage, and after each pad cures, connecting roads will be regraded/realigned to tie into the pad as shown. Estimated construction value is between $5 million and $10 million. This is a sources-sought market research effort and not a solicitation; no proposals are requested at this time and the government is not obligated to compensate respondents for information provided.
Interested firms should submit a brief capabilities statement (no more than 3 pages) demonstrating ability to perform. Include your company name and contacts, business size and certifications (e.g., small business, 8(a), HUBZone, SDVOSB, women-owned), bonding capability (per-contract and aggregate), and a narrative describing the primary business and experience with similar work at similar value and location. Provide 2–3 examples of successful, similar projects from the past five years, including project scope, size, current percent complete and completion date, contract value, and the portion of work self-performed. Submissions must be electronic to the designated contracting office; hard copies will not be considered. No solicitation exists, no unsolicited proposals will be accepted, and phone inquiries are not being accepted.
PROJECT DESCRIPTION: The U.S. Army Corps of Engineers, Norfolk District is contemplating a firm-fixed-price contract for the Design-Bid-Build construction of 24 concrete turning pads, as well as site drainage and road alignment and repair where required. The contract will be executed in three phases. The contractor will only have access to one phase at a time and must complete that phase before moving on to the next phase. While the contractor is working on one phase the Army will be conducting training in the other two phases. Each turning point identified in the drawings will require the existing roadbed to be excavated and concrete placed in accordance with the design. Storm drainage work will be required to maintain positive drainage of the site during construction activities. Once the turning pad has cured properly, the exiting connecting roads shall be regraded/aligned to tie into the pad as shown in the contract drawings. Magnitude of Construction cost is between $5,000,000 - $10,000,000 THIS SOURCES SOUGHT ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. It is a market research tool being used to determine the availability and adequacy of potential sources prior to determining the acquisition strategy. The Government is not obligated to and will not pay for any information received from potential sources as a result of this announcement. It is requested that interested sources submit to the contracting office a brief capabilities statement package demonstrating ability to perform the requested services identified in this survey. Submittal should be no more than 3 pages in length, single-spaced, 12 point font minimum. RESPONSE REQUIREMENTS: 1. Offeror's name, addresses, points of contact, telephone numbers, CAGE code, UEI, and e-mail addresses. 2. Offeror's business size to include each designation as Certified Small Businesses, 8(a) contractors, HUBZone Certified Small Business Concerns, Service-Disabled Veteran Owned Small Businesses and Woman Owned Businesses. For 8(a) Contractors, please include proposed graduation date from the 8(a) Program. 3. Offeror s bonding capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars). 4. Provide a narrative indicating the primary nature of your business. Narratives shall demonstrate experience in a similar type of work as described, at a similar contract value, and in a similar location. 5. Description of Experience Provide two (2) to three (3) examples of successful projects similar to requirements described in the project description above, within the past five (5) years. If a specialty sub-contractor is used, the sub-contractor shall also provide work examples and experience. Based on definitions above, for each project submitted include: a. Current percentage of construction complete and the date when it was or will be completed. b. Scope of the project c. Size of the project d. Dollar value of the project e. The portion and percentage of work that was self-performed DISCLAIMER: Since this is a Sources Sought Announcement only, no evaluation letters and/or results will be issued to the respondents. No solicitation exists and solicitation requests will not be acknowledged. USACE Norfolk District is not seeking or accepting unsolicited proposals and will not accept telephone inquiries. This Sources Sought should not be construed in any manner to be an obligation of the U.S. Army Corps of Engineers, Norfolk District to issue a contract, or result in any claim for reimbursement of costs for any effort you expend responding to this request. RESPONSE: All responses to this announcement may be sent electronically to Brian C Bookout at brian.c.bookout@usace.army.mil and copy to Nicholas.lizotte@usace.army.mil. All mailed (hard copy) responses will not be considered.
From Sources Sought posted on Nov 04, 2025Notice history
1-
Sources Sought LATEST Posted Nov 04, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA