Construction Airfield Blast Shield FA466126R0008
Summary
AI-generated · Aug 07, 2026Fabricate and erect new Blast Deflector Fences (blast shields) for the B1-B airfield, providing all labor, equipment, and materials to meet contract specs and the latest codes (IBC, UFC, ETLs, etc.). The blast deflector must be curved, non-perforated, galvanized corrugated with horizontal corrugations, using Lynnco GS-20-2 as the standard; alternate types may be allowed only with the Contracting Officer’s approval. The system must be installed by a blast-fence experienced contractor and be capable of withstanding the afterburner throttle of 30,000 lbs thrust from a B1-B engine nozzle at 90 feet from the foundation, with extrapolated temperatures around 1400 F at 900 mph. Access and operations require using the approved haul route via the Tye Gate, with restricted work areas, a fenced laydown yard, and pre-construction coordination; all material submittals must use AF Form 3000 in original electronic PDF format (no scans), and a two-week schedule must be submitted to the Escort POC at least one week before work starts, including start/end times, crew sizes, and work locations. The yard and contractor limits must be maintained, restored to pre-construction conditions, and any changes to project limits require approval from 7 CES through the Contracting Officer; a pre-construction meeting will designate the approved laydown yard. Work is in a restricted area and requires escorts.
Amendment 1 updates the response date; no change to technical requirements. This is market research only, with no proposals reviewed or accepted at this time.
Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes. The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH. Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting. Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations. Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.
From Sources Sought posted on Aug 05, 2026Amendment 1: Response date changed from August 7, 2026 to August 14, 2026 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes. The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH. Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting. Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations. Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.
From Sources Sought posted on Aug 07, 2026Notice history
2-
-
Sources Sought LATEST Posted Aug 07, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Aug 07, 2026 → Aug 14, 2026
Details
Award Information
Not yet awarded