Construct two Standard Design Trench Lines, Range 305, Grafenwoehr Training Area W912PB26QA044
Summary
AI-generated · Apr 11, 2026Construct two standard-design trench lines at Range 305, Grafenwoehr Training Area. The work includes excavation around entries/exits, bunkers, and the main trench; installation of precast concrete elements and wooden coverings; installation of basalt gravel by manual excavation; and installation of two hand grenade bunkers.
This project includes the following work: Excavation work in the area of entries/exits, bunkers and main trench. Installation of precast concrete elements. Wooden covering of the precast concrete elements. Install gravel basalt by manual excavation. Install 2 ea hand grenade bunkers.
From Presolicitation posted on Apr 10, 2026Notice history
1-
Presolicitation LATEST Posted Apr 10, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
DEU