Construct Tool and Die Facility, Iowa Army Ammunition Plant W9128F25BA013
Summary
AI-generated · Aug 24, 2025Two-Step Sealed Bidding (FAR Part 14.5) is used to solicit a Tool and Die Facility at the Iowa Army Ammunition Plant. Step-One requests technical proposals only; the drawings and specifications are about 95% complete and not final or construction-ready. Proposals in Step-One must not include prices, and bid bonds are not required at this stage.
Bid bonds will be required with the Step-Two bid submission. There is no change between the notices; both describe identical Step-One requirements and the overall two-step process.
This solicitation and the resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95%complete and not considered final or for construction. Submitted technical proposals in response to this solicitation shall not include prices or pricing information. Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission.
From Solicitation posted on Jun 27, 2025This solicitation and the resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95%complete and not considered final or for construction. Submitted technical proposals in response to this solicitation shall not include prices or pricing information. Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission.
From Solicitation posted on Jul 16, 2025This solicitation and the resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95%complete and not considered final or for construction. Submitted technical proposals in response to this solicitation shall not include prices or pricing information. Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission.
From Solicitation posted on Aug 28, 2025UPDATE AMENDMENT 0002 28 August 2025 - In Accordance with FAR 14.503-2(b) - The following contractors submitted an acceptable Step One proposal: Alberici Constructors, Inc. (St. Louis MO) LS Black Constructors (Colorado Springs CO) The Tepa Companies (Colorado Springs CO) Tutor Perini Corporation (Framingham MA) This solicitation and the resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95%complete and not considered final or for construction. Submitted technical proposals in response to this solicitation shall not include prices or pricing information. Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission.
From Solicitation posted on Aug 29, 2025UPDATE 16 September 2025 ABSTRACT OF OFFERORS is now added as an attachment in the attachments section. UPDATE AMENDMENT 0002 28 August 2025 - In Accordance with FAR 14.503-2(b) - The following contractors submitted an acceptable Step One proposal: Alberici Constructors, Inc. (St. Louis MO) LS Black Constructors (Colorado Springs CO) The Tepa Companies (Colorado Springs CO) Tutor Perini Corporation (Framingham MA) This solicitation and the resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95%complete and not considered final or for construction. Submitted technical proposals in response to this solicitation shall not include prices or pricing information. Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission.
From Solicitation posted on Sep 16, 2025Notice history
5-
Solicitation Posted Jun 27, 2025
-
Solicitation Posted Jul 16, 2025No changes from previous notice