Consolidated Space Operations Facility, Schriever AFB, Colorado W9128F20R0002
Summary
AI-generated · Aug 24, 2025Construct the Consolidated Space Operations Facility (CSOF) at Schriever Air Force Base. The project comprises a two-story CSOF with reinforced concrete foundation, a steel structure, and a low-slope membrane roof, plus a one-story entry-control facility at the south side of the restricted area. It is designed as permanent construction to DoD UFC standards (General Building Requirements and High Performance/Sustainable Building Requirements), with a preference for local materials and construction techniques when cost-effective. The work must comply with DoD antiterrorism/force protection requirements and cybersecurity requirements for facility-related control systems. Start within 10 days of notice to proceed and finish no later than 1,400 calendar days after NTP, with liquidated damages for delays, and required performance and payment bonds. The procurement is a two-phase, unrestricted competition open to both large and small businesses; CADD/BIM files and a list of firms/POCs from the virtual site visit are provided in the package.
Since prior notices, multiple amendments have been issued, including wage-update amendments (Amendment 0011) and subsequent amendments (e.g., 0012), with the CADD/BIM files and site-visit participation details provided. The two-phase structure remains in place, and firms that did not submit in Phase 1 will not be evaluated in Phase 2; the package continues to include project specifications, drawings, and instructions to offerors.
Purpose of this update on 20 August 2021 is to post Amendment 0012 for Solicitation W9128F20R0002. Purpose of this update on 20 August 2021 is to post Amendment 0011 for Solicitation W9128F20R0002 due to wage updates. Purpose of this update on 08 June 2021 is to post Amendment 0010 for Solicitation W9128F20R0002. Amendment 0010 is expected to be posted by close of business 8 June with no extension due date anticipated. Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002. Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002. Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002. Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided. Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002. Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit. Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002. This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. Project Description: This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements." This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems." The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The project specifications, applicable drawings and instructions to offerors are included in the attached documents.
From Solicitation posted on Aug 20, 2025Purpose of this update on 20 August 2021 is to post Amendment 0012 for Solicitation W9128F20R0002. Purpose of this update on 20 August 2021 is to post Amendment 0011 for Solicitation W9128F20R0002 due to wage updates. Purpose of this update on 08 June 2021 is to post Amendment 0010 for Solicitation W9128F20R0002. Amendment 0010 is expected to be posted by close of business 8 June with no extension due date anticipated. Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002. Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002. Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002. Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided. Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002. Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit. Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002. This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. Project Description: This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements." This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems." The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The project specifications, applicable drawings and instructions to offerors are included in the attached documents.
From Solicitation posted on Aug 21, 2025Notice history
2-
-
Solicitation LATEST Posted Aug 21, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA