Contacts, documents and full notice history are available with a subscription.
Special Notice SBA Expired 3 notices 2 documents

Concrete BPA Order - Riprap in Pool 11 - Hurricane Island, WI W912EK24QCA07POOL11

Solicitation W912EK24QCA07POOL11 Copied Notice ID 535435eb40bc4fac893b18a95caec058 Copied DEPT OF DEFENSE — W07V ENDIST ROCK ISLAND
SAM.gov
Posted
Jul 21, 2025
Deadline
Jul 25, 2025
Set-aside
SBA
NAICS
327320
PSC
5610

Summary

AI-generated · Aug 24, 2025

Riprap installation in Pool 11 at Hurricane Island, WI under a Concrete BPA order.

Description fields are blank in all three records, so there are no details on scope, technical requirements, deliverables, schedule, or submission instructions. The three records are identical, with no new information or changes to describe.

The U.S Army Corps of Engineers (USACE) require the supply of RR-5 Riprap to the Mississippi River Project Office (MRPO)- Project Maintenance Unit to be placed by USACE personnel and floating plant assets. A call order was issued via email to all current blanket purchase agreement (BPA) holders to submit quotes on 16 July 2025 at 2:00 PM CST. In accordance with FAR 5.101(a)(1) proposed contract actions expected to exceed $25,000 must be disseminated by synopsizing in the Governmentwide point of entry, which is https://www.sam.gov. Pool 11 - Riprap Suppy Purchase Description: Supply and load 20,000 tons of general-purpose riprap, in accordance with paragraph k, with options for an additional 40,000 tons. Riprap will be placed by USACE personnel and floating plant assets. The contractor will be responsible for delivering and loading riprap onto the deck of USACE barges. The loading of riprap must take place between River Miles 606 - 609 of the Upper Mississippi River, near Cassville Wisconsin. Base: Up to and including 20,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The contractor should be ready to start delivery within two weeks of contract award, however, project start date may vary due to current workload of the Project Maintenance Fleet or unforeseen delays mentioned above. It is anticipated for loading to begin between the dates of August 01, 2025 and September 01, 2025. The exact start date will be identified to the contractor upon contract award. Option 1: Up to and including 15,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 1 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 1. Option 2: Up to and including 10,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 2 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 2. Option 3: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option- no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 3. Option 4: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 4 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 4. Option 5: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 5 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 5. Interested vendors may submit a quote by completing the bid schedule in the attached statement of work and sending it to the email contacts listed below before the deadline posted on this notice. Unless a quote received via this notice is less than the lowest priced offer received from the BPA holders, quotes submitted in response to this notice will not be considered for award. In the unlikely event that an award is made from response to this notice the terms and conditions would be similar to the Pool 11 - Riprap Supply Purchase Description Terms found in the Attachments/Links section below. Attachments/Links - Pool 11 - Riprap Supply Purchase Description - Attachment A - LDOT RR-5 Coarse Alternative Riprap Gradation Curve & Tally Chart

From Special Notice posted on Jul 14, 2025

The U.S Army Corps of Engineers (USACE) require the supply of RR-5 Riprap to the Mississippi River Project Office (MRPO)- Project Maintenance Unit to be placed by USACE personnel and floating plant assets. A call order was issued via email to all current blanket purchase agreement (BPA) holders to submit quotes on 16 July 2025 at 2:00 PM CST. In accordance with FAR 5.101(a)(1) proposed contract actions expected to exceed $25,000 must be disseminated by synopsizing in the Governmentwide point of entry, which is https://www.sam.gov. Pool 11 - Riprap Suppy Purchase Description: Supply and load 20,000 tons of general-purpose riprap, in accordance with paragraph k, with options for an additional 40,000 tons. Riprap will be placed by USACE personnel and floating plant assets. The contractor will be responsible for delivering and loading riprap onto the deck of USACE barges. The loading of riprap must take place between River Miles 606 - 609 of the Upper Mississippi River, near Cassville Wisconsin. Base: Up to and including 20,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The contractor should be ready to start delivery within two weeks of contract award, however, project start date may vary due to current workload of the Project Maintenance Fleet or unforeseen delays mentioned above. It is anticipated for loading to begin between the dates of August 01, 2025 and September 01, 2025. The exact start date will be identified to the contractor upon contract award. Option 1: Up to and including 15,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 1 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 1. Option 2: Up to and including 10,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 2 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 2. Option 3: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option- no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 3. Option 4: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 4 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 4. Option 5: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 5 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 5. Interested vendors may submit a quote by completing the bid schedule in the attached statement of work and sending it to the email contacts listed below before the deadline posted on this notice. Unless a quote received via this notice is less than the lowest priced offer received from the BPA holders, quotes submitted in response to this notice will not be considered for award. In the unlikely event that an award is made from response to this notice the terms and conditions would be similar to the Pool 11 - Riprap Supply Purchase Description Terms found in the Attachments/Links section below. Attachments/Links - Pool 11 - Riprap Supply Purchase Description - Attachment A - LDOT RR-5 Coarse Alternative Riprap Gradation Curve & Tally Chart Updates: Posted 17 July 2025 - Extend due date to 25 July 2025 at 2:00 PM CST.

From Special Notice posted on Jul 17, 2025

The U.S Army Corps of Engineers (USACE) require the supply of RR-5 Riprap to the Mississippi River Project Office (MRPO)- Project Maintenance Unit to be placed by USACE personnel and floating plant assets. A call order was issued via email to all current blanket purchase agreement (BPA) holders to submit quotes on 16 July 2025 at 2:00 PM CST. In accordance with FAR 5.101(a)(1) proposed contract actions expected to exceed $25,000 must be disseminated by synopsizing in the Governmentwide point of entry, which is https://www.sam.gov. Pool 11 - Riprap Suppy Purchase Description: Supply and load 20,000 tons of general-purpose riprap, in accordance with paragraph k, with options for an additional 40,000 tons. Riprap will be placed by USACE personnel and floating plant assets. The contractor will be responsible for delivering and loading riprap onto the deck of USACE barges. The loading of riprap must take place between River Miles 606 - 609 of the Upper Mississippi River, near Cassville Wisconsin. Base: Up to and including 20,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The contractor should be ready to start delivery within two weeks of contract award, however, project start date may vary due to current workload of the Project Maintenance Fleet or unforeseen delays mentioned above. It is anticipated for loading to begin between the dates of August 01, 2025 and September 01, 2025. The exact start date will be identified to the contractor upon contract award. Option 1: Up to and including 15,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 1 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 1. Option 2: Up to and including 10,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 2 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 2. Option 3: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option- no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 3. Option 4: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 4 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 4. Option 5: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 5 no later than 15 September 2025. The delivery start date is to be NLT two (2) weeks after exercising Option 5. Interested vendors may submit a quote by completing the bid schedule in the attached statement of work and sending it to the email contacts listed below before the deadline posted on this notice. Unless a quote received via this notice is less than the lowest priced offer received from the BPA holders, quotes submitted in response to this notice will not be considered for award. In the unlikely event that an award is made from response to this notice the terms and conditions would be similar to the Pool 11 - Riprap Supply Purchase Description Terms found in the Attachments/Links section below. Attachments/Links - Pool 11 - Riprap Supply Purchase Description - Attachment A - LDOT RR-5 Coarse Alternative Riprap Gradation Curve & Tally Chart Updates: Posted 17 July 2025 - Extend due date to 25 July 2025 at 2:00 PM CST. Posted 21 July 2025 - Revised SOW dated 07.21.20525. All changes highlighted.

From Special Notice posted on Jul 21, 2025

Notice history

3
  1. Special Notice Posted Jul 14, 2025 View
  2. Special Notice Posted Jul 17, 2025
    • Description: Description was updated
    • Response Deadline: Jul 18, 2025Jul 25, 2025
  3. Special Notice LATEST Posted Jul 21, 2025
    • Description: Description was updated

Details

Solicitation number W912EK24QCA07POOL11
Notice ID 535435eb40bc4fac893b18a95caec058
Notice type Special Notice
Product / Service (PSC) 5610
NAICS 327320
Place of performance Wisconsin
Archive date Jul 25, 2025

Award Information

Not yet awarded

Contacts

primary
Bobbi Boeh

Email

Phone

secondary
Jeffrey Voss

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
W07V ENDIST ROCK ISLAND

Place of Performance

Wisconsin 53806
USA

Dates

Posted Jul 21, 2025 1 year ago
Last Updated Aug 05, 2026 2 days ago
Due Jul 25, 2025 1 year ago