Commander, Navy Installations Command (CNIC) Design-Bid-Build, RM-23-1146 Dry Dock 2 Caisson Overhaul at Portsmouth Naval Shipyard (PNSY) in Kittery, Maine N6247026R0031
Summary
AI-generated · Jun 06, 2026CNIC is planning a Design-Bid-Build project to overhaul Dry Dock 2 Caisson at Portsmouth Naval Shipyard in Kittery, Maine, to maintain certification. The scope includes a full overhaul of the Dry Dock 2 Caisson, with caisson seat extension and a vertical extension to provide continuous flood protection from Berth 6 through the caisson to Berth 5.
Portions of the work will require the caisson to be out of the water during execution.
The Government is contemplating an award of a Commander, Navy Installations Command (CNIC) Design-Bid-Build, RM-23-1146 Dry Dock 2 Caisson Overhaul at Portsmouth Naval Shipyard (PNSY) in Kittery, Maine. This project performs a required overhaul of the Dry Dock 2 Caisson to maintain certification. This also includes caisson seat extension and vertical extension of the existing caisson to provide continuous flood protection from Berth 6 through the caisson and to Berth 5. Portions of work will need to be performed with the caisson out of the water.
From Sources Sought posted on Jun 05, 2026Notice history
1-
Sources Sought LATEST Posted Jun 05, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA