Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 1 notice 3 documents

Combined Synopsis/Solicitation for North American Power Grid Frequency Monitoring Network for the Federal Energy Regulatory Commission (FERC) 89603025Q0044_1

Solicitation 89603025Q0044_1 Copied Notice ID 8e691d51a48f44fbb87ad507b6da7624 Copied ENERGY, DEPARTMENT OF — FEDERAL ENERGY REGULATORY COMM
SAM.gov
Posted
Jul 08, 2025
Deadline
Jul 16, 2025
Set-aside
NONE
NAICS
541519
PSC
7A21

Summary

AI-generated · Aug 24, 2025

Provide a real-time (or near real-time) dynamic monitoring application that tracks electric-system frequency, voltage, and phase-angle measurements across a wide area to support situational awareness and reliability metrics for FERC’s Office of Electric Reliability. The solution should leverage data akin to reports from FNET’s Phasor Measurement Unit (PMU) data collection on an interconnection or wide-area basis to monitor the system and enable study of various power-system phenomena. This capability was developed in response to recommendations in the August 14, 2003 Blackout Final Report and is a major responsibility of the Office of Electric Reliability.

The Office of Electric Reliability (OER) has a need for a real-time, or near real-time application to monitor the dynamic behaviors of the electric system through frequency, voltage, and phase angle measurements, accurately and on a wide-area basis. These measurements can then be used by FERC staff for situational awareness capabilities and the Commission s Strategic Plan metrics related to reliability and to study various power system phenomena. In accordance with agency objectives and Mission Essential Functions, OER has a need to procure a real-time (or near real-time) dynamic, power angle measurement application service to monitor the electric system frequency, voltage, and phase angle measurements, accurately such as may be obtained via reports from FNET s Phasor Measurement Unit data collection on an Interconnection or wide-area basis to meet the agency's needs. The requirement to perform the electric system reliability monitoring function was created in response to recommendations provided in the Final Report on the August 14, 2003 Blackout in the United States and Canada, 20041 and is identified as one of the major areas of responsibilities for the Office of Electric Reliability.

From Combined Synopsis/Solicitation posted on Jul 08, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jul 08, 2025

Details

Solicitation number 89603025Q0044_1
Notice ID 8e691d51a48f44fbb87ad507b6da7624
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 7A21
NAICS 541519
Set-aside No Set aside used
Place of performance Washington, District of Columbia
Archive date Jul 31, 2025

Award Information

Not yet awarded

Contacts

primary
Kevin Richards

Email

Phone

Agency

ENERGY, DEPARTMENT OF
FEDERAL ENERGY REGULATORY COMMISSION
FEDERAL ENERGY REGULATORY COMM

Place of Performance

Washington, District of Columbia 20426
USA

Dates

Posted Jul 08, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 16, 2025 1 year ago