Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 6 documents

Comanche Park Campground Reconstruction 1240LT26Q0046

Solicitation 1240LT26Q0046 Copied Notice ID 3eb74f6ca8d64e5c8644f58d59ef8053 Copied AGRICULTURE, DEPARTMENT OF — Black Hills National Forest
SAM.gov
Posted
Apr 10, 2026
Deadline
May 11, 2026
Set-aside
SBA
NAICS
237110
PSC
Y1NE

Summary

AI-generated · Apr 11, 2026

Upgrade of Comanche Park Campground requires a contractor to provide all labor, materials, and equipment to expand 20 existing sites to 34, including a road modification for drainage with curve widening and new surfacing. The Host Site and Volunteer Site will be relocated and upgraded with power, water, and wastewater vaults. Replace five original 1965 stick-built toilets with four new pre-cast vault toilets. In addition, the water system will be overhauled: decommission the existing pumphouse, install a new pre-cast concrete treatment building in a new location with upgraded plumbing and controls, remove the aboveground storage tank and install a new below-ground fiberglass storage tank, replace all distribution piping, and install new hydrants in accordance with the SOW, specifications, and drawings.

Estimated construction magnitude: $1,000,000 to $5,000,000. An organized site visit will be conducted at the campground to review the site, led by Richard Zacher. The campground is located 6.5 miles west of Custer, SD on US-16.

POC Erick Plamann, Contract Specialist, erick.plamann@usda.gov Comanche Park Campground Reconstruction The contractor will provide all labor, materials, and equipment for the campground improvement of 20 sites to 34 sites to include a road modification with curve widening and shaping for drainage and new surfacing. The Host Site and Volunteer Site will be relocated and upgraded with power, water and wastewater vaults. 4 new pre-cast vault toilets will replace the five original 1965 stick-built toilets. The Water system work for this project consists of decommissioning the existing pumphouse, installing a new pre-cast concrete treatment building in a new location, with upgraded plumbing and controls, removing the existing aboveground water storage tank and installing a new below ground fiberglass water storage tank, replacing all the distribution piping and installing new hydrants IAW with SOW, Specifications and Drawings Magnitude of Construction is between $1,000,000 and $5,000,000 NAICS 237110 - Water and Sewer Line and Related Structures Construction Organized Site Visit Name: Richard Zacher Address: Comanche Park Campground is located 6.5 miles west of Custer, SD on US16 Date and Time: April 17, 2026, 9:00 AM Mountain Telephone: 605-673-9222 Email: richard.zacher@usda.gov

From Combined Synopsis/Solicitation posted on Apr 10, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Apr 10, 2026

Details

Solicitation number 1240LT26Q0046
Notice ID 3eb74f6ca8d64e5c8644f58d59ef8053
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Y1NE
NAICS 237110
Place of performance Custer, South Dakota
Archive date May 26, 2026

Award Information

Not yet awarded

Contacts

primary
Erick Plamann

Email

secondary
Lucas Dahlman

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
Black Hills National Forest

Place of Performance

Custer, South Dakota 57730
USA

Dates

Posted Apr 10, 2026 3 months ago
Last Updated Aug 06, 2026 2 days ago
Due May 11, 2026 2 months ago