Colorado Springs Airtanker Electrical Project 1240LT26Q0043
Summary
AI-generated · Mar 20, 2026Provide all labor, materials, equipment, and related items to install electrical power to the loading pits at the Colorado Springs Airtanker Base. The electrical system must power micro-motion meters used for retardant loading in accordance with policy for agency-contracted air tankers, and all work must be weatherproof for outdoor exposure. Full project requirements are in the Statement of Work; a site visit is scheduled with details in the solicitation.
Solicitation 1240LT26Q0043 is issued as a Request for Quotation (RFQ) for supplying all labor, materials, equipment and miscellaneous items for the purpose of installing electrical power to the loading pit(s) at the Colorado Springs Airtanker Base. Electrical power is needed for micro motions meters which are required by policy for the loading of retardant on the agency contracted air tankers and all electrical work needs to be weatherproof due to outdoor exposure. Refer to the Statement of work for the full electrical project requirements. See the attached Solicitation and applicable documents for full project details and requirements. NOTE: A site Visit will be held on March 26th, 2026. Refer to Solicitation for details and requirements.
From Combined Synopsis/Solicitation posted on Mar 19, 2026Amendment 0001 - To provide Question and Answers and Site Visit Atendee list. See 1240LT26Q0043_A0001_S for full details. Solicitation 1240LT26Q0043 is issued as a Request for Quotation (RFQ) for supplying all labor, materials, equipment and miscellaneous items for the purpose of installing electrical power to the loading pit(s) at the Colorado Springs Airtanker Base. Electrical power is needed for micro motions meters which are required by policy for the loading of retardant on the agency contracted air tankers and all electrical work needs to be weatherproof due to outdoor exposure. Refer to the Statement of work for the full electrical project requirements. See the attached Solicitation and applicable documents for full project details and requirements. NOTE: A site Visit will be held on March 26th, 2026. Refer to Solicitation for details and requirements.
From Combined Synopsis/Solicitation posted on Apr 02, 2026Notice history
2-
Combined Synopsis/Solicitation Posted Mar 19, 2026
-
Combined Synopsis/Solicitation LATEST Posted Apr 02, 2026View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA