COAST GUARD STATION PROVINCETOWN SEWAGE REPAIRS 37020250000018
Summary
AI-generated · Aug 23, 2025Replace a bathroom and galley sewer pipe in the building at Coast Guard Station Provincetown, providing all labor, equipment, tools, materials, supervision, transportation, and related services. Work includes removing the current failed cast-iron sewer pipe in the bathroom, installing heavy-duty, code-compliant PVC piping and fittings, and confirming the repair is leak-free. If necessary, cut out and replace any rot-damaged studs, wood, or drywall, first attempt to snake the failed pipe from the galley clean-out outside the building, and if snaking isn’t possible, remove and replace the pipe with PVC to code and ensure a leak-free repair. Also replace the galley floor (concrete and tile) since there is no basement under the galley, reconnect the galley garbage disposal, and use the exterior clean-out to ensure all sewage flows to the city main line. Clean up debris and dispose of waste materials.
Site visits are required before submitting an estimate; see the Statement of Work for full details and arrange the visit with the Contracting Officer’s Representative.
SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to replace a bathroom and a galley sewer pipe in the Multi-mission Building (MMB). Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following. Removal of current failed/cracked cast iron sewer pipe in bathroom. Replace cracked pipe with heavy duty, to code, PVC pipe and connections. Confirm repair will not leak. Cut out and replace any studs/wood/drywall where there has been rot/water damage to this area. First, snake the current failed/clogged cast iron sewer pipe underneath galley from the clean-out, outside of the MMB. If current failed/clogged cast iron sewer pipe can t be snaked, remove this failed/clogged pipe and replace with heavy duty, to code, PVC pipe and connections. Confirm repair will not leak. Replace concrete and tile floor in galley, as there is no basement under the galley area. Re-connect galley garbage disposal to be used by station. Use the Clean Out, outside of the MMB to make sure all sewage pipes flow to the city s main line. Clean areas of debris and dispose materials. SITE VISITS ARE REQUIRED FOR THIS PROJECT. PLEASE DO NOT SUBMIT YOUR ESTIMATE WITHOUT FIRST CONDUCTING A SITE VISIT. THIS CAN BE DONE BY CONTACTING THE COR AT 440-787-5429. SEE SOW FOR FULL DETAILS
From Presolicitation posted on Jun 23, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA