Closed-Circuit TV Camera Surveillance System 1197508
Summary
AI-generated · Aug 24, 2025Upgrade eight existing security cameras (inside and outside) by removing the current system and installing a new CCTV system, including two new monitoring stations and four new cameras. The work covers mounting cameras to walls, drilling three 3/4-inch holes through CMU to conduit exterior wires, sealing holes, routing new wires through existing conduit baskets, and connecting low-voltage camera wires to spare outlets. Asbestos or lead-based paint abatement may be required, and coordination with JBLM DPW is required throughout the project.
The two records describe the same requirement and are identical; there are no changes between notices.
Closed-Circuit TV Camera Surveillance System - Upgrade 8 existing security cameras both inside and out of facility. Provide and representatives, and includes removal of the existing system, and the installation of a new system including cameras and monitoring stations. install 2 new monitoring stations and 4 new cameras- fix camera mounts to wall, drill three 3/4" holes through CMU for conduit to house new exterior camera wires. Seal off holes around conduit. Once wire is inside building, run wires in existing COM baskets and hook low voltage camera wires to existing spare accessory outlets. Asbestos/lead-based paint abatement if necessary. The work will be coordinated with JBLM DPW.
From Combined Synopsis/Solicitation posted on Jul 15, 2025Closed-Circuit TV Camera Surveillance System - Upgrade 8 existing security cameras both inside and out of facility. Provide and representatives, and includes removal of the existing system, and the installation of a new system including cameras and monitoring stations. install 2 new monitoring stations and 4 new cameras- fix camera mounts to wall, drill three 3/4" holes through CMU for conduit to house new exterior camera wires. Seal off holes around conduit. Once wire is inside building, run wires in existing COM baskets and hook low voltage camera wires to existing spare accessory outlets. Asbestos/lead-based paint abatement if necessary. The work will be coordinated with JBLM DPW.
From Combined Synopsis/Solicitation posted on Aug 01, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Aug 01, 2025View changes (1)
- Response Deadline: Jul 31, 2025 → Aug 11, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA