Clarence J. Brown Reservoir Project Office Re Roofing W912QR25QA058
Summary
AI-generated · Aug 24, 2025Install a metal profile roofing system on the Clarence J. Brown Dam and Reservoir Project office, including removing and re-installing existing gutters and solar panels. All materials must comply with the Build America Buy America Act. The contractor must have at least three years of experience in roof repair and be classified as a small business.
Amendment 0001 states the scope of work and wage determinations have been replaced in their entirety. An additional site visit is scheduled for August 25, 2025 at 1:00 PM ET (per FAR clause 52.236-27 ALT 1). The bid due date has been extended from August 25, 2025 at 11:00 AM ET to August 29, 2025 at 11:00 AM ET.
The contractor shall furnish all labor, materials, supplies, tools and equipment necessary to install a metal profile roofing system on the CJ Brown Dam and Reservoir Project office, including removing and re-installing existing gutters and solar panels. All purchased materials shall adhere to the Build America Buy America Act. Contractor shall have three years experience in roof repair and be classified as a small business.
From Solicitation posted on Jul 31, 2025The contractor shall furnish all labor, materials, supplies, tools and equipment necessary to install a metal profile roofing system on the CJ Brown Dam and Reservoir Project office, including removing and re-installing existing gutters and solar panels. All purchased materials shall adhere to the Build America Buy America Act. Contractor shall have three years? experience in roof repair and be classified as a small business. Amendment 0001 - 8/20/2025 - THE SCOPE OF WORK HAS BEEN REPLACED IN IT'S ENTIRETY. WAGE DETERMINATIONS HAVE BEEN REPLACED IN IT'S ENTIRETY. AN ADDITIONAL SITE VISIT HAS BEEN SCHEDULED FOR 25 AUGUST 2025 AT 1:00PM ET (INFORMATION LOCATED IN FAR CLAUSE 52.236-27 ALT 1), AND EXTENDING THE DUE DATE FROM 25 AUGUST 2025 AT 11:00AM ET, TO 29 AUGUST 2025 AT 11:00AM ET.
From Solicitation posted on Aug 20, 2025The contractor shall furnish all labor, materials, supplies, tools and equipment necessary to install a metal profile roofing system on the CJ Brown Dam and Reservoir Project office, including removing and re-installing existing gutters and solar panels. All purchased materials shall adhere to the Build America Buy America Act. Contractor shall have three years? experience in roof repair and be classified as a small business. Amendment 0001 - 8/20/2025 - THE SCOPE OF WORK HAS BEEN REPLACED IN IT'S ENTIRETY. WAGE DETERMINATIONS HAVE BEEN REPLACED IN IT'S ENTIRETY. AN ADDITIONAL SITE VISIT HAS BEEN SCHEDULED FOR 25 AUGUST 2025 AT 1:00PM ET (INFORMATION LOCATED IN FAR CLAUSE 52.236-27 ALT 1), AND EXTENDING THE DUE DATE FROM 25 AUGUST 2025 AT 11:00AM ET, TO 29 AUGUST 2025 AT 11:00AM ET.
From Solicitation posted on Aug 26, 2025Notice history
3-
-
Solicitation Posted Aug 20, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 25, 2025 → Aug 29, 2025
-
Solicitation LATEST Posted Aug 26, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Documents
9Contacts
Phone
Agency
Place of Performance
Springfield, Ohio 45503
USA