CHPP Industrial Hygiene FA500426Q0003
Summary
AI-generated · May 27, 2026Provide all labor (including employee training), materials, equipment, supervision, and supplies necessary to perform industrial and general cleaning services in the Central Heat and Power Plant (CHPP) at Eielson AFB. The work occurs in a hazardous industrial environment with combustible coal dust, heat exposure, and risk of heat exhaustion, requiring ladders, lifts, scaffolding, mops, explosion-proof vacuum, respirators, and fall protection. Must comply with 29 CFR 1910 OSHA General Industry Regulations; certification is required and must be on site and available for review at all times. The cleaning scope covers all vertical and horizontal surfaces—walls, floors, stairwells, structural beams, piping, ducts, generators, equipment, and control panels—removing coal/ash dust, grease, and oil buildup well beyond normal dusting.
This solicitation seeks contractors to perform comprehensive CHPP cleaning with on-site supervision and OSHA compliance. An amendment adds questions and answers, with all other terms and conditions remaining the same.
The purpose of this amendment is to: 1) Add questions and answers. All other terms and conditions remain the same ****************************************************************************************************************************************************** The contractor shall provide all labor (including employee training), materials, equipment, supervision, and supplies as necessary to provide industrial and general cleaning services in the Central Heat and Power Plant (CHPP) at Eielson AFB. Due to the industrial nature of the required cleaning, there will be hazardous working conditions including combustible coal dust, heat exposure and heat exhaustion. Work shall require the use of equipment such as ladders, lifts, scaffolding, mops, explosion-proof vacuum, respirators, fall protection, etc. Must comply with all applicable 29 CFR 1910 OSHA General Industry Regulations. Provide certification and must be on site and available for review at all times. Services shall be performed on all vertical and horizontal surfaces in the plant including but not limited to all walls, floors, stairwells, structural beams, piping, ducts, generators, equipment, and control panels. The cleaning of all vertical and horizontal surfaces requires removing build-up of coal/ash dust particles, grease, oil, and goes well beyond normal dusting service.
From Combined Synopsis/Solicitation posted on May 26, 2026The purpose of this amendment is to: Extend the due date to 5 June 2026 All other terms and conditions remain the same The purpose of this amendment is to: 1) Add questions and answers. All other terms and conditions remain the same ****************************************************************************************************************************************************** The contractor shall provide all labor (including employee training), materials, equipment, supervision, and supplies as necessary to provide industrial and general cleaning services in the Central Heat and Power Plant (CHPP) at Eielson AFB. Due to the industrial nature of the required cleaning, there will be hazardous working conditions including combustible coal dust, heat exposure and heat exhaustion. Work shall require the use of equipment such as ladders, lifts, scaffolding, mops, explosion-proof vacuum, respirators, fall protection, etc. Must comply with all applicable 29 CFR 1910 OSHA General Industry Regulations. Provide certification and must be on site and available for review at all times. Services shall be performed on all vertical and horizontal surfaces in the plant including but not limited to all walls, floors, stairwells, structural beams, piping, ducts, generators, equipment, and control panels. The cleaning of all vertical and horizontal surfaces requires removing build-up of coal/ash dust particles, grease, oil, and goes well beyond normal dusting service.
From Combined Synopsis/Solicitation posted on May 29, 2026Notice history
2-
Combined Synopsis/Solicitation Posted May 26, 2026
-
Combined Synopsis/Solicitation LATEST Posted May 29, 2026View changes (2)
- Description: Description was updated
- Response Deadline: May 29, 2026 → Jun 05, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA