Chiller Replacement Roybal Campus 75D301-26-R-73398
Summary
AI-generated · Feb 05, 2026Design-build construction services are sought to modernize the central plant and replace four chillers at the CDC Roybal campus in Atlanta. Replace four existing 1,450-ton chillers with 1,800-ton units, replace eight cooling towers, and install four chilled-water pumps. Because the central plant operates 24/7 and campus demands require that only two chillers be shut down at a time, bypass piping must be installed to facilitate shutdowns. Electrical scope includes two new motor control centers, replacement of medium-voltage starters, and recircuiting, with additional work on building automation systems, fire protection, architectural and structural components. The design-build team will deliver complete construction design documents and full construction services, including management, bonds, insurance, CPM schedules, health and safety plans, quality control, submittal development and review, coordination drawings, construction administration, security and logistics, procurement of tools and materials, training, warranties, and record documents.
Procurement is anticipated to be unrestricted, using a best-value tradeoff for a firm-fixed-price contract under FAR Part 15. The project magnitude is over $10 million. Firms must be US-based with offices in the continental US and SAM-registered. An eight-page narrative response is requested from qualified firms, detailing capabilities, bonding levels, and experience with central-plant renovations of similar size (over $10 million). Responses are not bids and are not binding; they should be submitted via email to the designated CDC contact by the stated deadline. Feedback on submissions will not be provided.
THIS IS A SOURCES SOUGHT NOTICE. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME. The Centers for Disease Control and Prevention (CDC) will likely issue a solicitation, as a Request for Proposal (RFP), for design build construction services for a central plant modernization and chiller replacement at the CDC Roybal campus located at 1600 Clifton Rd., Atlanta, GA 30329 in calendar year 2026. CDC requests letters of interest from qualified SMALL AND LARGE BUSINESS MECHANICAL CONTRACTORS THAT CAN PERFORM AS A PRIME GENERAL CONTRACTOR on the planned central plant modernization and chiller replacement in Atlanta, Georgia. By way of this Sources Sought, CDC intends to determine the extent of capable firms that are engaged in providing the construction services described hereunder. Responses to this notice are not offers and cannot be accepted by the U.S. Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this notice. Response to this Request for Information is not mandatory for consideration in any subsequent Request for Proposal. The Modernization will include design build mechanical work including replacement of four existing 1,450 ton chillers with 1,800 ton chillers, replacement of eight cooling towers and four chilled water pumps. Due to the 24/7 operation of the central plant and campus demands; of the 4 chillers to be replaced only 2 can be taken out of operation and bypass piping will need to be installed to facilitate shutdown. Contracting performing work must have a 2 hour emergency response time. Electrical work includes installation of two new Motor Control Centers (MCC), replacing medium voltage (MV) starters and recircuiting. The project also involves, building automation systems (BAS), fire protection, architectural and structural work. As part of the design-build scope, the design portion includes providing complete for construction design documents and construction services, including, but not limited to: management and inspection services, bonds, insurance, CPM schedules, health and safety plan, quality control plan, product submittal development and review, develop required coordination drawings, construction administration services, security and logistic control, furnish tools, materials, equipment, labor and incidentals, safety review/inspections, quality control, coordinate all construction related work, test and inspections, commissioning, operational manuals, facilities maintenance training, record documents, warranties, and other related professional services. This procurement is anticipated to be unrestricted regarding business size. Interested contractors must have an active registration, including completion of the annual representations and certifications, in the System for Award Management (SAM) at http://sam.gov at the time of proposal submission in order to be eligible for award. Only Contractor firms and their major consultants/joint venture partners having offices within the continental United States will be considered for this procurement. The proposed project is anticipated to be a competitive, firm-fixed-price, construction contract procured in accordance with FAR Part 15, Contracting by Negotiation, under a Best Value-Tradeoff Process. The estimated magnitude of construction is over $10 million. The North American Industry Classification System (NAICS) for this requirement is 238220 (Commercial and Intuitional Building Construction) Business Size Standard of $45 Million. Submission Instructions: Narrative shall be no longer than 8 pages. Comments will be shared within the Government and the Integrated Project Team but will otherwise be held in strict confidence. Should you respond to this Request for Information, please submit the following information: 1. Firm s name, address, point of contact, phone number, and e-mail address, and capabilities. 2. Firm s level of interest in competing on the solicitation when it is issued. 3. Firm s Business Size Large, Small, Small Disadvantaged Business (SDB), Service Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zones (HubZone), Woman Owned Small Business (WOSB), certified 8(a) firms, and SBA approved Mentor-Protg firms. 4. Firm s experience in successfully completed central plant renovation projects of similar size and dollar value range over $10,000,000.00. 5. Firm s bonding level. THIS NOTICE IS NOT A REQUEST FOR PROPOSAL, QUOTE OR BID. It is one market research tool being utilized to determine the availability of potential qualified contractors in acquisition planning. In addition, this Request for Information is not to be considered as a commitment by the Government, nor will the Government pay for any information solicited or delivered. Response is not required for eligibility to participate in any subsequent Request for Proposal. Interested parties who consider themselves qualified to perform the above-listed requirement are invited to submit a response to this Request for Information no later than 5:00 P.M. Eastern Standard Time (EST) Feburary 18, 2026. All responses under this Sources Sought must be emailed to Simi Khera, hkhera@cdc.gov referencing the SAM Publication number 75D301-26-R-73398 Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. If you have any questions concerning this opportunity, please contact: Simi Khera via email at hkhera@cdc.gov.
From Sources Sought posted on Feb 04, 2026This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant. b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances. c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration. d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement. e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A. f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.
From Presolicitation posted on Apr 23, 2026This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant. b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances. c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration. d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement. e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A. f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.
From Combined Synopsis/Solicitation posted on Apr 23, 2026This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV SITE VISIT: MAY 19TH @10AM Q&A's: MAY 27TH @12 PM PROPOSAL: JUNE 17@ 10AM
From Solicitation posted on May 27, 2026This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV SITE VISIT: MAY 19TH @10AM Q&A's: MAY 27TH @12 PM PROPOSAL: JUNE 17@ 10AM SECOND SITE VISIT IS SCHEDULED FOR 10 June @10 am Roybal Campus PROPOSAL DUE DATE EXTENDED TO: 7 July @ Noon
From Solicitation posted on Jun 16, 2026This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV SITE VISIT: MAY 19TH @10AM Q&A's: MAY 27TH @12 PM PROPOSAL: JUNE 17@ 10AM SECOND SITE VISIT IS SCHEDULED FOR 10 June @10 am Roybal Campus PROPOSAL DUE DATE EXTENDED TO: 7 July @ Noon
From Solicitation posted on Jun 22, 2026Notice history
6-
Sources Sought Posted Feb 04, 2026
-
Presolicitation Posted Apr 23, 2026View changes (4)
- Description: Description was updated
- Notice Type: Sources Sought → Presolicitation
- Response Deadline: Feb 18, 2026 → May 08, 2026
- Set-Aside: No Set aside used → Total Small Business Set-Aside (FAR 19.5)
-
Combined Synopsis/Solicitation Posted Apr 23, 2026View changes (2)
- Notice Type: Presolicitation → Combined Synopsis/Solicitation
- Response Deadline: May 08, 2026 → Jun 15, 2026
-
Solicitation Posted May 27, 2026View changes (3)
- Description: Description was updated
- Notice Type: Combined Synopsis/Solicitation → Solicitation
- Response Deadline: Jun 15, 2026 → Jun 17, 2026
-
Solicitation Posted Jun 16, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jun 17, 2026 → Jul 07, 2026
-
Solicitation LATEST Posted Jun 22, 2026No changes from previous notice
Details
Award Information
Not yet awarded