CGC MOBILE BAY HYDRAULIC SWING DRIVE ASSEMBLIES 70Z08525Q0020194
Summary
AI-generated · Aug 24, 2025Replace four hydraulic swing drive assemblies on the CGC Mobile Bay crane (EB150-75-55S) at the cutter’s homeport in Sturgeon Bay, WI. After a pre-operational crane test, the contractor must remove the four existing swing drive assemblies, securely package them for transport, have unit personnel take custody of the originals, and then clean and prep the mounting surfaces for installation of four replacement swing drive assemblies. The contractor will supply and install the four new swing drive assemblies.
Post-installation, the contractor must verify there are no leaks, confirm proper crane operation, and witness both static and dynamic weight tests. The contractor must provide all parts, consumables, and hydraulic fluid, plus any shore-side equipment needed to remove crane parts. Unit personnel will assist as available, but the contractor is the lead on the project and unit personnel are only to assist.
STATEMENT OF WORK CGC MOBILE BAY OPFAC: 09-17503 LOCATION: Sturgeon Bay, WI EQUIPMENT: APPLETON CRANE EB150-75-55S COMPONENT AFFECTED: HYDRAULIC SWING DRIVE ASSEMBLIES PARTS: AMD-3343 SWING DRIVE ASSEMBLY Qnty: 04 Drawing: APPLETON MARINE_CRANE ASSEMBLY_AMD 852 All work shall be conducted at cutters homeport in Sturgeon Bay, WI. Contractor must witness the operation of the crane. Once pre-operational test is complete, contractor must remove all 04 swing drive assemblies. Once swing drive assemblies are removed, they must properly and safely package all 4 swing drive assemblies for transport. Unit will assume control of the original swing drive assemblies. Contractor must then clean and prep the mounting surface for installation of replacement swing drive assemblies. Contractor shall then provide 04 replacement swing drive assemblies and install them. Once installation is complete, contractor must witness there are no leaks; ensure proper operation of the crane; and witness both static and dynamic weight test of the crane. Unit personnel will be at the ready to operate the crane. Contractor will provide any shore side equipment needed for use to remove any parts of the crane. Contractor must provide all parts, consumables, and hydraulic fluid. Unit personnel, if available, will be able to assist. Contractor must understand that they are lead on this project and unit personnel are ONLY to assist. Unit POC: Mobile Bay POC CWO Josh Deisher (920) 743-7351 Address: USCGC Mobile Bay WTGB103 36 S Neenah Ave Sturgeon Bay WI 54235
From Special Notice posted on Jun 25, 2025Notice history
1-
Special Notice LATEST Posted Jun 25, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA