CFA-608/609 HVAC INL-26-007
Summary
AI-generated · Nov 20, 2025Replace and upgrade HVAC systems at CFA-608 and CFA-609 to restore reliable environmental control in laboratory and high-bay spaces. CFA-608 will replace the steam boiler with an electric boiler and install a global building controller to integrate with the site network, while maintaining the 100% outside air unit and six heating-only fan coils in the high-ceiling lab. CFA-609 will replace the 1985 steam boiler with an electric boiler of equivalent capacity, update multizone AHU controls from pneumatic to modern equivalents, maintain the DX cooling coil and steam heating coil, replace three unit heaters (UH-1: 30,650 BTU/hr; UH-2 and UH-3: 44,109 BTU/hr each), and install a global building controller to connect to the site network.
This Expression of Interest is the initial step to identify qualified vendors for a potential RFQ. Respondents should include their company name and point of contact, a description of HVAC capabilities relevant to the CFA-608/609 scope, business size/classification, and any existing DOE or federal contracting experience. Indicate how any proprietary information should be labeled. Only selected respondents will be invited to participate in the anticipated RFQ.
1. INTRODUCTION Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors for the replacement and upgrade of HVAC systems at CFA-608 and CFA-609. These systems are critical to maintaining environmental control and operational reliability in laboratory and high-bay spaces. 2. BACKGROUND INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The HVAC systems at CFA-608 and CFA-609 are past their useful life, rely on outdated fuel oil-powered steam boilers, and are increasingly difficult to maintain due to part availability and aging infrastructure. Work summary will include: CFA-608: o Replace the existing steam boiler with an electric boiler o Install a global building controller to integrate with the site-wide network o Maintain the existing 100% outside air unit and six heating-only fan coils in the high-ceiling lab CFA-609: o Replace the existing steam boiler (installed in 1985) with an electric boiler of equivalent capacity o Replace the multizone air handling unit (AHU) controls, currently pneumatic, with modern equivalents o Maintain the DX coil for colling and steam coil for heating o Replace three unit heaters (UH-1: 30,650 BTU/HR; UH-2 & UH-3: 44,109 BTU/HR each) o Install a global building controller to tie into the site-wide network 3. PROCESS This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Quote (RFQ) process for award consideration. 4. SUBMITTAL REQUIREMENTS Interested vendors should submit an Expression of Interest that includes the following: Company name and point of contact Description of HVAC system capabilities relevant to the CFA-608/609 scope NAICS codes and business size classification Any existing DOE or federal contracting experience (if applicable) Deadline for submission: 05/01/2026 Submit to: Chase.Egbert@inl.gov Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFQ solicitation. 5. PROPRIETARY INFORMATION Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.
From Sources Sought posted on Nov 19, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA