Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 4 documents

CES - Replace Heaters W912L325RA008

Solicitation W912L325RA008 Copied Notice ID 1bb1cba97f3b4b65ae9f26d11121dc24 Copied DEPT OF DEFENSE — W7N9 USPFO ACTIVITY WY ARNG
SAM.gov
Posted
Sep 12, 2025
Deadline
Sep 18, 2025
Set-aside
SBA
NAICS
423730
PSC
4520

Summary

AI-generated · Sep 09, 2025

Remove the existing heating unit by safely disconnecting and removing all related components (duct connections, gas line, electrical wiring, venting) and dispose of the old system and waste per environmental regulations. Install a new natural gas furnace of equivalent specifications—Lennox G61MPV-60C-090-07 with an 80/90 BTU/hr input and 96% efficiency—per manufacturer’s instructions and all applicable codes, and connect it to the existing gas lines, water lines, electrical (if required), and venting.

Reconnect the new unit to the existing ductwork and ensure all connections are secure and leak-free. Inspect the ductwork for leaks, damage, and insulation; clean the work area afterward. Program the EMCS controls for the new system, following the existing programming and parameters. The contractor is responsible for disposing of old hot water heaters.

Remove Existing Unit: - Safely disconnect and remove the existing systems, including all associated components (e.g., duct connections, gas line, electrical wiring, venting). - Properly dispose of the old sytems and all associated waste materials in accordance with environmental regulations. Replace Components: - Install the new furnace according to the manufacturer's specifications and all applicable codes and regulations. The new systems shall be of an equivalent spec (e.g., Natural Gas, furnace with an 80/90 BTU/hr input and a 96% efficiency rating. The make and model are Lennox G61MPV-60C-090-07. - Connect the new natural gas unit to existing gas lines, water lines, electrical (if required) and venting system, ensuring proper fittings and seals. - Connect the systems to the existing ductwork, gas line, electrical connections, and venting system - Ensure all connections are secure and leak-free. - Inspect the existing ductwork for leaks, damage, and proper insulation. - Clean the work area, removing any debris or leftover materials. - Contractor responsible for disposing of old hot water heaters Program new controls on EMCS. - Follow existing programming for new systems install, with same parameters.

From Solicitation posted on Sep 08, 2025

Remove Existing Unit: - Safely disconnect and remove the existing systems, including all associated components (e.g., duct connections, gas line, electrical wiring, venting). - Properly dispose of the old sytems and all associated waste materials in accordance with environmental regulations. Replace Components: - Install the new furnace according to the manufacturer's specifications and all applicable codes and regulations. The new systems shall be of an equivalent spec (e.g., Natural Gas, furnace with an 80/90 BTU/hr input and a 96% efficiency rating. The make and model are Lennox G61MPV-60C-090-07. - Connect the new natural gas unit to existing gas lines, water lines, electrical (if required) and venting system, ensuring proper fittings and seals. - Connect the systems to the existing ductwork, gas line, electrical connections, and venting system - Ensure all connections are secure and leak-free. - Inspect the existing ductwork for leaks, damage, and proper insulation. - Clean the work area, removing any debris or leftover materials. - Contractor responsible for disposing of old hot water heaters Program new controls on EMCS. - Follow existing programming for new systems install, with same parameters.

From Solicitation posted on Sep 12, 2025

Notice history

2
  1. Solicitation Posted Sep 08, 2025 View
  2. Solicitation LATEST Posted Sep 12, 2025
    • Description: Description was updated

Details

Solicitation number W912L325RA008
Notice ID 1bb1cba97f3b4b65ae9f26d11121dc24
Notice type Solicitation
Product / Service (PSC) 4520
NAICS 423730
Place of performance Cheyenne, Wyoming
Archive date Oct 03, 2025

Award Information

Not yet awarded

Contacts

primary
Nickolas Woske

Email

secondary
Benjamin Taylor

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
W7N9 USPFO ACTIVITY WY ARNG

Place of Performance

Cheyenne, Wyoming 82009
USA

Dates

Posted Sep 12, 2025 10 months ago
Last Updated Aug 05, 2026 2 days ago
Due Sep 18, 2025 10 months ago