Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 5 notices 15 documents

Central Monorail Hoist Commissioning RFP-LBNF-368455-BF

Solicitation RFP-LBNF-368455-BF Copied Notice ID a1cbb7af9c9649b2b56fa94e081203ff Copied ENERGY, DEPARTMENT OF — FERMILAB - DOE CONTRACTOR
SAM.gov
Posted
Aug 04, 2025
Deadline
Aug 08, 2025
Set-aside
NONE
NAICS
333923
PSC
3950

Summary

AI-generated · Aug 25, 2025

Qualified crane and hoist contractors are invited to modify, install, and commission two 20-ton CMCO electric monorail hoist and trolley assemblies on the South Cavern central monorail to move materials underground, with two of these hoists already purchased and warehoused in Rapid City, SD to be installed after a rail survey and modification of existing trolleys to fit the installed central rail. A second pair of 20-ton hoists and trolley assemblies will be purchased under this contract and installed on the North Cavern central rail. The central monorail beams in both caverns were installed but not in CMAA straightness specifications, so the work includes modifying the trolleys, performing a proper rail survey, and commissioning the hoists/trolleys to achieve CMAA-compliant straightness on both beams.

No changes have been indicated across the notices; the scope remains identical, with responsibilities including rail survey, trolley adaptation, hoist installation, and commissioning on both North and South Cavern central rails.

The excavation of the caverns at LBNF has been completed. A contractor has installed the central monorail beams in both the North and South Caverns. Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness. Fermi Forward Discovery Group LLC is now requesting proposals from qualified crane and hoist contractors who are interested in performing the modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in both the North and South caverns. Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Rapid City, SD. These two hoists will need to be installed on the South Cavern central rail to facilitate movement of materials underground. The existing trolleys will need to be modified to fit onto the installed central rail once a proper rail survey has been performed. Two more 20-ton electric monorail hoists and trolley assemblies will be purchased through this contract. These two additional hoists will be installed on the North Cavern central rail to facilitate movement of materials underground.

From Solicitation posted on Jun 18, 2025

The excavation of the caverns at LBNF has been completed. A contractor has installed the central monorail beams in both the North and South Caverns. Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness. Fermi Forward Discovery Group LLC is now requesting proposals from qualified crane and hoist contractors who are interested in performing the modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in both the North and South caverns. Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Rapid City, SD. These two hoists will need to be installed on the South Cavern central rail to facilitate movement of materials underground. The existing trolleys will need to be modified to fit onto the installed central rail once a proper rail survey has been performed. Two more 20-ton electric monorail hoists and trolley assemblies will be purchased through this contract. These two additional hoists will be installed on the North Cavern central rail to facilitate movement of materials underground.

From Solicitation posted on Jul 02, 2025

The excavation of the caverns at LBNF has been completed. A contractor has installed the central monorail beams in both the North and South Caverns. Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness. Fermi Forward Discovery Group LLC is now requesting proposals from qualified crane and hoist contractors who are interested in performing the modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in both the North and South caverns. Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Rapid City, SD. These two hoists will need to be installed on the South Cavern central rail to facilitate movement of materials underground. The existing trolleys will need to be modified to fit onto the installed central rail once a proper rail survey has been performed. Two more 20-ton electric monorail hoists and trolley assemblies will be purchased through this contract. These two additional hoists will be installed on the North Cavern central rail to facilitate movement of materials underground.

From Solicitation posted on Jul 08, 2025

The excavation of the caverns at LBNF has been completed. A contractor has installed the central monorail beams in both the North and South Caverns. Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness. Fermi Forward Discovery Group LLC is now requesting proposals from qualified crane and hoist contractors who are interested in performing the modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in both the North and South caverns. Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Rapid City, SD. These two hoists will need to be installed on the South Cavern central rail to facilitate movement of materials underground. The existing trolleys will need to be modified to fit onto the installed central rail once a proper rail survey has been performed. Two more 20-ton electric monorail hoists and trolley assemblies will be purchased through this contract. These two additional hoists will be installed on the North Cavern central rail to facilitate movement of materials underground.

From Solicitation posted on Jul 30, 2025

The excavation of the caverns at LBNF has been completed. A contractor has installed the central monorail beams in both the North and South Caverns. Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness. Fermi Forward Discovery Group LLC is now requesting proposals from qualified crane and hoist contractors who are interested in performing the modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in both the North and South caverns. Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Rapid City, SD. These two hoists will need to be installed on the South Cavern central rail to facilitate movement of materials underground. The existing trolleys will need to be modified to fit onto the installed central rail once a proper rail survey has been performed. Two more 20-ton electric monorail hoists and trolley assemblies will be purchased through this contract. These two additional hoists will be installed on the North Cavern central rail to facilitate movement of materials underground.

From Solicitation posted on Aug 04, 2025

Notice history

5
  1. Solicitation Posted Jun 18, 2025 View
  2. Solicitation Posted Jul 02, 2025
    • Response Deadline: Jul 25, 2025Aug 08, 2025
  3. Solicitation Posted Jul 08, 2025
    No changes from previous notice
  4. Solicitation Posted Jul 30, 2025
    No changes from previous notice
  5. Solicitation LATEST Posted Aug 04, 2025
    No changes from previous notice

Details

Solicitation number RFP-LBNF-368455-BF
Notice ID a1cbb7af9c9649b2b56fa94e081203ff
Notice type Solicitation
Product / Service (PSC) 3950
NAICS 333923
Set-aside No Set aside used
Place of performance South Dakota
Archive date Aug 23, 2025

Award Information

Not yet awarded

Contacts

primary
Bridget Fugett

Email

Phone

secondary
Jeremy Duncan

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
FERMILAB - DOE CONTRACTOR

Place of Performance

South Dakota 57754
USA

Dates

Posted Aug 04, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 08, 2025 11 months ago