Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation Expired 1 notice 2 documents

CENTAM Guardian26 Line Haul HND SLV "Subject to Availability of Fund" W912QM26QA0050002

Solicitation W912QM26QA0050002 Copied Notice ID 598b8e2d99524dde85450c5b670a0df8 Copied DEPT OF DEFENSE — 0410 AQ HQ CONTRACT
SAM.gov
Posted
Feb 27, 2026
Deadline
Mar 02, 2026
Set-aside
None
NAICS
484121
PSC
V112

Summary

AI-generated · Feb 28, 2026

Provide line-haul transportation from Soto Cano Air Base, Honduras to multiple locations in El Salvador under a non-personal services contract, supplying all necessary personnel, equipment, facilities, and supervision (including flatbeds, lowboys, removable goose neck trailers, and a 10K forklift with at least 72-inch forks) to move supplies, materials, equipment, and containers safely and expeditiously. Coordinate with Soto Cano AB and JTF-B J-4 to accurately process entry passes and deployment/redeployment documentation before equipment arrival; perform all work in accordance with the PWS and under COR oversight. Funding is not presently available and is contingent on fund availability per FAR 52.232-18; period of performance is 07 April 2026 through 15 May 2026.

Operational specifics include use of 14 trucks to move containers from Honduras to Ilopango, El Salvador, with staging at Ilopango before onward movement to training sites; containers will remain on their chassis during staging. Initial agricultural cleaning (six 90 PSI pressure washers with a 10% final rinse, 100% interior/exterior) will occur at Soto Cano prior to loading. After El Salvador customs inspection, the 14 trucks will relocate containers to designated training sites as directed, with coordination and updates managed through the COR (noting RFIs confirm 14 trucks).

*FUNDS ARE NOT PRESENTLYAVAILABLE FOR THIS REQUIREMENT ANDIS SUBJECT TO AVAILABILITY OF FUNDS IN ACCORDANCE WITH FAR 52.232-18* The Regional Contracting Office-Soto Cano is seeking to obtain support to provide Line Haul Service between Soto Cano Air Base, Honduras to Multiple Locations in El Salvador. Contractor shall provide non-personal services The Contractor shall provide all personnel, equipment, supplies, facilities, flatbeds, lowboys, Removable Goose Neck (RGN), 10K forklift with extended forks at least 72 inches, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Contractor line haul services with drivers to transport supplies, materials, equipment, and containers safely and expeditiously to include where the Contractor shall coordinate with Soto Cano AB, JTF-B J-4 to accurately process all required entry passes documentation for deployment and redeployment before equipment arrival. The Contractor shall accomplish all services in coordination with the COR as defined in this PWS. The Contractor shall perform to the standards in this contract. POP: 07 April 2026 -15 May 2026 RFIs: On/around April 7 (deployment from Soto Cano to Ilopango): Once the 14 twenty-foot containers arrive at Ilopango after border crossing and customs inspection, will they be offloaded/staged at Ilopango that day, or will they remain on the trucks for follow-on movements to La Union and Chalatenango the same day or next day? Answer: The containers will stage at Ilopongo until they are ready to move o/a 12 April to respective locations. At no point will containers be removed for chassis. For the required agricultural cleaning (six 90 PSI pressure washers, 10% solution final rinse, 100% inside/outside): Will the initial wash occur at Soto Cano AB while containers are on the ground before loading, or is it only required at the border before crossing into El Salvador? Answer: There will be a wash at Soto Cano, Mr. Geronimo can speak on further details as he will manage that process. Not aware of additional washings after departure including at the border. PWS Says 5.2.3.12.1. Once all trucks with cargo arrive at Ilopango El Salvador, from Honduras, the El Salvador Customs team will inspect all containers. Once inspection is complete (18) eighteen trucks will move their containers to various training sites for drop off. See attachment #1. But attachement 1 says (14) fourteen trucks. is it 18 or 14? Answer: PWS updated, it is (14) fourteen trucks.

From Combined Synopsis/Solicitation posted on Feb 27, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Feb 27, 2026

Details

Solicitation number W912QM26QA0050002
Notice ID 598b8e2d99524dde85450c5b670a0df8
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) V112
NAICS 484121
Place of performance HND
Archive date Mar 17, 2026

Award Information

Not yet awarded

Contacts

primary
MAJ Dustin L. Caranci

Email

Phone

secondary
CPT Chuanchuan Sun

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
ACC-OO
410TH CSB
0410 AQ HQ CONTRACT

Place of Performance


HND

Dates

Posted Feb 27, 2026 5 months ago
Last Updated Aug 06, 2026 2 days ago
Due Mar 02, 2026 5 months ago