CELLULAR DISTRIBUTED ANTENNA SYSTEM FA441725Q0231
Summary
AI-generated · Aug 24, 2025Hurlburt Field requires non-personal services to plan, install, integrate, and commission a Cellular Distributed Antenna System, including personnel, equipment, supervision, and other items necessary to perform the installation in accordance with the attached Statement of Objectives. Proposals must be SAM-registered to be eligible. The package includes the SOO, related build-out documents, AFSSI-7702 countermeasures, wage determinations, and addenda, along with Site Visit Instructions. For site surveys, contractors may use the WilsonPro 5G Network Scanner (Model 910060) or the Anritsu MS2713E Spectrum Master to measure LMR signals in building 90834, provided measurements are not made in classified processing areas and a 2-meter separation from any classified devices is maintained; compliance with AFSSI-7702 handheld-radio/LMRS countermeasures is required, including not bringing handheld radios within 2 meters of RED processors without prior Base EMSEC Office consultation.
Amendment 0001 updates the attachment list to reflect a revised SOO, notes that no Government Furnished Property is identified, and renames the attached SOO as “Attachment 1 - SOO v.1 - 4 SOAMXS Cellular Distributed Antenna System.” All other terms remain unchanged. The Site Visit provisions and related documents (including wage determinations, FAR addenda, and site materials) are retained.
Hurlburt Field Air Force Base has a requirement for a non-personal services to include personnel, equipment, supervision, and other items and services necessary to perform Cellular Distributed Antenna System Installation Services IAW the attached Statement of Objectives (SOO). Offerors must be registered in the System for Award Management (SAM) order to be eligible to receive an award from any Government solicitation. Visit the SAM website https://sam.gov/content/home for more information. For additional information or assistance, please contact: AlC Gery Reyes Ramos, Contract Specialist, email: gery.reyes_ramos@us.af.mil AND Alyssa Garred, Contracting Officer, email: alyssa.garred@us.af.mil See attached documents for more information: Solicitation - FA441725Q0231 Attachment 1 - SOO - 4 SOAMXS Cellular Distributed Antenna System SOO Attachments: AMU_100 PERCENT URF_DWGS_A101 Hurlburt As-Builts Rev-2 AFSSI_7702, Attch 14 (CAO 13OCT23) Attachment 2 - SCA Wage Determinations 2015-4531 Attachment 3 - Addendum to FAR 52.212-1 and 52.212-2 Attachment 4 - Site Visit Instructions
From Solicitation posted on Jul 16, 2025Regarding the Site Visit on 29 July 2025: BLUF: A Contractor has asked for authorization to use the WilsonPro 5G Cellular Network Scanner (Model 910060) or the Anritsu MS2713E Spectrum Master for signal measurements in building 90834 to measure LMR signals. The contractor is allowed to conduct the site survey with the device(s). The contractor must not use the device(s) in areas where classified processing occurs and so long as the contractor maintains 2M separation from any classified devices while conducting measurements with the device. Please see the information below, provided by the Cyber Security Team for further information. IAW AFSSI-7702, there are just two sections that notate countermeasures for handheld radio devices and LMRS: 1.5. (U) As a general rule of thumb, do not bring handheld radios within 2 meters of RED processors without firstconsulting the Base EMSEC Office. Do not bring cordless telephones, cellular phones, microphones, wireless mice orkeyboards, wireless local area networks (LANs), Infrareed LANs or devices, or other personal. And 5.4.2. Hand-Held Radios. These countermeasures are required. Hand-held radiotransceivers used with intrabase radios and land mobile radios (LMR) deserve special consideration because of their unique operational applications. A person may carry these portable radios in the standby mode, into an area where classified information is processed. Given that information, the contractor is allowed to conduct their site survey with this device, so long as they maintain 2M separation from any classified devices while doing so. Hurlburt Field Air Force Base has a requirement for a non-personal services to include personnel, equipment, supervision, and other items and services necessary to perform Cellular Distributed Antenna System Installation Services IAW the attached Statement of Objectives (SOO). Offerors must be registered in the System for Award Management (SAM) order to be eligible to receive an award from any Government solicitation. Visit the SAM website https://sam.gov/content/home for more information. For additional information or assistance, please contact: AlC Gery Reyes Ramos, Contract Specialist, email: gery.reyes_ramos@us.af.mil AND Alyssa Garred, Contracting Officer, email: alyssa.garred@us.af.mil See attached documents for more information: Solicitation - FA441725Q0231 Attachment 1 - SOO - 4 SOAMXS Cellular Distributed Antenna System SOO Attachments: AMU_100 PERCENT URF_DWGS_A101 Hurlburt As-Builts Rev-2 AFSSI_7702, Attch 14 (CAO 13OCT23) Attachment 2 - SCA Wage Determinations 2015-4531 Attachment 3 - Addendum to FAR 52.212-1 and 52.212-2 Attachment 4 - Site Visit Instructions
From Solicitation posted on Jul 24, 2025Amendement 0001: The purpose of this amendment is to: A) Update the attachment list to incorporate the revised SOO. B) The revised SOO redacted subsections 5.1 - 5.4, located on page eight (8), regarding Government Furnished Property. No Government Furnished Property has been identified for this requirement. C) The revised SOO is titled, "Attachment 1 - SOO v.1 - 4 SOAMXS Cellular Distributed Antenna System." D) All other terms and conditions remain unchanged. Regarding the Site Visit on 29 July 2025: BLUF: A Contractor has asked for authorization to use the WilsonPro 5G Cellular Network Scanner (Model 910060) or the Anritsu MS2713E Spectrum Master for signal measurements in building 90834 to measure LMR signals. The contractor is allowed to conduct the site survey with the device(s). The contractor must not use the device(s) in areas where classified processing occurs and so long as the contractor maintains 2M separation from any classified devices while conducting measurements with the device. Please see the information below, provided by the Cyber Security Team for further information. IAW AFSSI-7702, there are just two sections that notate countermeasures for handheld radio devices and LMRS: 1.5. (U) As a general rule of thumb, do not bring handheld radios within 2 meters of RED processors without firstconsulting the Base EMSEC Office. Do not bring cordless telephones, cellular phones, microphones, wireless mice orkeyboards, wireless local area networks (LANs), Infrareed LANs or devices, or other personal. And 5.4.2. Hand-Held Radios. These countermeasures are required. Hand-held radiotransceivers used with intrabase radios and land mobile radios (LMR) deserve special consideration because of their unique operational applications. A person may carry these portable radios in the standby mode, into an area where classified information is processed. Given that information, the contractor is allowed to conduct their site survey with this device, so long as they maintain 2M separation from any classified devices while doing so. Hurlburt Field Air Force Base has a requirement for a non-personal services to include personnel, equipment, supervision, and other items and services necessary to perform Cellular Distributed Antenna System Installation Services IAW the attached Statement of Objectives (SOO). Offerors must be registered in the System for Award Management (SAM) order to be eligible to receive an award from any Government solicitation. Visit the SAM website https://sam.gov/content/home for more information. For additional information or assistance, please contact: AlC Gery Reyes Ramos, Contract Specialist, email: gery.reyes_ramos@us.af.mil AND Alyssa Garred, Contracting Officer, email: alyssa.garred@us.af.mil See attached documents for more information: Solicitation - FA441725Q0231 Attachment 1 - SOO v.1 - 4 SOAMXS Cellular Distributed Antenna System SOO Attachments: AMU_100 PERCENT URF_DWGS_A101 Hurlburt As-Builts Rev-2 AFSSI_7702, Attch 14 (CAO 13OCT23) Attachment 2 - SCA Wage Determinations 2015-4531 Attachment 3 - Addendum to FAR 52.212-1 and 52.212-2 Attachment 4 - Site Visit Instructions
From Solicitation posted on Jul 29, 2025Notice history
3Details
Award Information
Not yet awarded
Documents
9Contacts
Phone
Agency
Place of Performance
USA