Contacts, documents and full notice history are available with a subscription.
Sources Sought NONE Expired 1 notice 1 document

Catch Basin Cleaning 36C26026Q0407

Solicitation 36C26026Q0407 Copied Notice ID 16fcdfb3ac1e473686fc1f2e2f3441c9 Copied VETERANS AFFAIRS, DEPARTMENT OF — 260-NETWORK CONTRACT OFFICE 20 (36C260)
SAM.gov
Posted
Mar 03, 2026
Deadline
Mar 17, 2026
Set-aside
NONE
NAICS
561210
PSC
S222

Summary

AI-generated · Mar 09, 2026

Provide all labor, equipment, tools, materials, transportation, disposal fees, and supervision necessary to perform the annual cleaning of catch basins, manholes, catch basins with pumps, and floor drains. Clean out and remove debris such as sand, dirt, mud, decaying organic material, leaves, trash, seed pods, sticks, etc., from all catch basins, manholes, and from street gutters within 20 feet in each direction of the basin or manhole. Approximately 73 catch basins and manholes require service; 5 with pumps; 9 floor drains; and 20–1000-gallon sediment separators with manholes are included.

Discharge of any cleaned storm sewer water in the basins and manholes may be pumped onto VA grounds only if it contains no oil or debris. The contractor must remove all debris and organic materials generated during cleaning and transport them off VA grounds for proper disposal. Locations are shown in the attached drawing. This is a market-survey (sources sought) to determine interest and capability for performing the work.

Provide all labor, equipment, tools, materials, transportation, disposal fee, and supervision necessary to provide the annual cleaning of catch basins and manholes, catch basins with pumps, and floor drains. The approximate locations are indicated in the attached drawing. The Contractor shall provide all labor, equipment, tools, materials, transportation, and supervision necessary to clean out and remove all debris, including, but not limited to, sand, dirt, mud, decaying organic material, leaves, trash, seed pods, sticks, etc., from all catch basins, manholes, and from street gutters within 20 each direction of the catch basin or manhole. There are approximately 73 catch basins and manholes that require this service. There are 5 catch basins with pumps that require this service. There are 9 floor drains that require this service. There are approximately 20 - 1000-gallon Sediment Separators with manholes that require this service. Clean storm sewer water in the manholes and catch basins may be pumped on to the VA grounds. No water with oil and/or debris may be pumped on to the grounds. Contractor will remove all debris generated by the cleaning operation, dispose of all debris and organic materials collected during the cleaning process and transport it off VAMC grounds for proper disposal.

From Sources Sought posted on Mar 03, 2026

Notice history

1
  1. Sources Sought LATEST Posted Mar 03, 2026

Details

Solicitation number 36C26026Q0407
Notice ID 16fcdfb3ac1e473686fc1f2e2f3441c9
Notice type Sources Sought
Product / Service (PSC) S222
NAICS 561210
Set-aside No Set aside used
Place of performance Boise, Idaho
Archive date Apr 01, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Craig L Brown

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
260-NETWORK CONTRACT OFFICE 20 (36C260)

Place of Performance

Boise, Idaho 83702
USA

Dates

Posted Mar 03, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 17, 2026 4 months ago