AI-generated · Apr 16, 2026Repair and upgrade Camp Robinson fuel facilities, covering extensive mechanical, electrical, and safety system work. Tasks include repairing and upgrading fencing and grounding, the lightning protection system, and canopy roof drain system, plus installation or replacement of meters, strainers, flow switches, pressure gauges, sight flow indicators, loading arm components, offload meters and proving connections, truck loading control valves, thermal relief valves, and related piping, fittings, and conduits. Also address alarms and signage (EFSO), roll-over curbs, containment piping, equipment pads, and grounding/lighting issues on dispensers and associated infrastructure, including a conversion to LED lighting and relocation of light poles, as needed.
In addition, rework containment and safety systems, including MSS perimeter grounding, repairing handhole covers, eyewash installation, repairing or replacing overfill alarms and related instrumentation, and removing the oil-water separator to install a remote containment basin. Scope includes installing new Mogas and F-24 dispenser islands and dispensers (with removal of existing), new Mogas and F-24 ASTs with catwalks and stairs (removing existing), and new AST tanks with pads and containment, along with Mogas and F-24 truck offloads containing infrastructure and canopy grounding/lighting and a comprehensive electrical/metering backbone.
All work required to repair Bulk fencing, fence grounding, Lightning Protection System, and canopy roof drain system. Install Basket Strainer, Install Flow Switch, Install Pressure Gauges, Install Sight Flow Indicator, Replace Loading Arm Swivel Joints, Install Offload Meter and Meter Proving Connections, Install Truck Loading Control Valve, Install Thermal Relief Valves, and Replace Threaded Piping and Fittings, Install Issue Meter Basket Strainer, and repair improper flexible conduit and Missing Sealing Fitting. Install Basket Strainer, Install Flow Switch, Install Pressure Gauges, Install Sight Flow Indicator, Replace Loading Arm Swivel Joints, Install Offload Meter and Meter Proving Connections, Install Truck Loading Control Valve, Install Thermal Relief Valves, Repair Filter Separator Control Valve, Repair Grounding on Catwalk and Ladder, Repair overfill alarm, Seal Open Fittings, and Repair Exposed Meter Conductors. All work to repair Missing EFSO Alarm and Signage. All work to repair Roll Over Curbs and Containment Drain Piping. All work to repair Equipment Pad. All work to Install Shear Valve on dispenser Piping, and repair Grounding Connections on Dispenser. All work required to repair MSS perimeter fence grounding. All work to repair Missing Handhole Cover on Light Pole and Change Pole Lights to LED. All work to relocate light poles. All work to repair EFSO System and Surge Protective Device and all work to install new eyewash. All work to repair asphalt pavement and concrete pavement to accomplish tank and dispenser infrastructure replacement. All work to remove Oil-water separator. All work to provide a new remote containment basin. All work to install New Mogas Dispenser Island and dispenser, including removal of the existing. All work to install New F-24 Dispenser Island and dispensers, including removal of the existing. All work to install New Mogas AST with catwalk and stairs, including removal of the existing. All work to install New F-24 AST with catwalk and stairs, including removal of the existing. All work to install New F-24 AST with catwalk and stairs, including removal of the existing. All work to install New Mogas Truck Offload with containment. All work to install F-24 Truck Offload with containment. All work to install New AST tank pad. All work to Lighting Protection System, Canopy Ground, and Canopy Lighting.
From Sources Sought posted on Apr 15, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
72199