Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 4 notices 20 documents

CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS 6982AF25B000013

Solicitation 6982AF25B000013 Copied Notice ID af6ac1920200468a85a636cca550df05 Copied TRANSPORTATION, DEPARTMENT OF — 6982AF CENTRAL FEDERAL LANDS DIVISI
SAM.gov
Posted
Mar 30, 2026
Deadline
Apr 30, 2026
Set-aside
NONE
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Mar 31, 2026

Improvements to approximately 56.5 miles of Mojave National Preserve roads in San Bernardino County, CA, including 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road, to enhance safety and visitor access. Work includes resurfacing, restoration, and rehabilitation, with full-depth reclamation and new asphalt pavement to a consistent 26-foot width on the paved segments, plus minor horizontal/vertical realignments in select areas, reinforcement of 48 low-water crossings (11 on South Kelbaker, 37 on Kelso-Cima), and safety enhancements such as rumble strips, signage, pavement markings, and paved pullouts. Morningstar Mine Road uses full-depth reclamation with surface-course aggregate, and a realignment is planned at the Kelso-Cima/Morningstar intersection.

Estimated cost is $80–$120 million. The project occurs in a natural-resource-sensitive area with environmental constraints that will affect scheduling and construction methods. Bidders must have prior experience on projects of similar magnitude. Major quantities include about 110,000 tons of asphalt pavement, 133,000 tons of roadway aggregate, 81,000 tons of surface aggregate, 110,000 cubic yards of roadway excavation, 49 miles of full-depth reclamation (method 2, 6-inch depth), 17,000 linear feet of concrete barrier for low-water crossings, 44 miles of fencing including tortoise barriers, 2,400 linear feet of tortoise crossing structures, and 12,000 cubic yards of riprap.

THIS IS AN INVITATION FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap

From Solicitation posted on Mar 30, 2026

THIS IS AN INVITATION FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap

From Solicitation posted on Apr 10, 2026

THIS IS AN INVITATION FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap

From Solicitation posted on Apr 29, 2026

THIS IS AN INVITATION FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap

From Solicitation posted on May 04, 2026

Notice history

4
  1. Solicitation Posted Mar 30, 2026
  2. Solicitation Posted Apr 10, 2026
    No changes from previous notice
  3. Solicitation Posted Apr 29, 2026
    • Response Deadline: Apr 30, 2026May 14, 2026
  4. Solicitation LATEST Posted May 04, 2026
    No changes from previous notice

Details

Solicitation number 6982AF25B000013
Notice ID af6ac1920200468a85a636cca550df05
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 237310
Set-aside No Set aside used
Place of performance Cima, California
Archive date May 15, 2026

Award Information

Not yet awarded

Contacts

primary
Jorey Deml

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI

Place of Performance

Cima, California 92323
USA

Dates

Posted Mar 30, 2026 4 months ago
Last Updated Aug 06, 2026 2 days ago
Due Apr 30, 2026 3 months ago