CA ERFO FS LSPDR 2023-1(1B) 6982AF25B000023
Summary
AI-generated · Sep 19, 2025A presolicitation for a total small business set-aside project seeks to rehabilitate and reconstruct about 6.9 miles of paved access road to the Paso Robles Long Range Radar site, starting at the Forest Service boundary milepost 0.3 and ending at the FAA radar site gate near milepost 7.22. The lower section of the road provides public access to campgrounds and other National Forest roads, while the upper section mainly serves FAA staff and nearby facilities. Plans and specifications are not available at this time.
Work includes a 4-inch full-depth reclamation of the roadway pavement and a 2-inch asphalt overlay, plus drainage improvements such as cleaning or replacing damaged drainage flumes and culverts, adding embankment material to eroded areas, and installing delineators and object markers. Roadway cross slopes will be adjusted to match new drainage locations, and traffic control will be required to maintain access to radar and communication sites during construction. Principal work items include shoulder and ditch reconditioning (about 4.5 miles), full-depth reclamation (about 7 miles), asphalt pavement (about 6,000 tons), and culverts cleaned (67 units). The estimated total project cost ranges from $5 million to $10 million.
THIS IS NOT AN INVITATION FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: CA ERFO FS LSPDR 2023-1(1B) PROJECT NAME: BLACK MOUNTAIN ROAD PROJECT DESCRIPTION: Black Mountain Road, also known as Paso Robles Radar Road, provides access to the Paso Robles California Air Route Surveillance Radar (ARSR) site, where continuous safe access to the facility is required. From the intersection with the County Road, the lower section of the road is 3.0 miles of Forest Service Road 29S02 (aka Navajo Road). The lower section facilitates public access to campgrounds and other roads within the National Forest. The upper section of the road is 3.9 miles of Forest Service Road 29S10 (aka Black Mountain Road). The upper section only provides access for Federal Aviation Administration (FAA) staff to the radar facility, with a gravel spur road providing access to AT&T and a private antenna site (the South Peak area), and to a few intersecting Off-Highway Vehicle (OHV) trails. PROJECT DETAILS: This project will rehabilitate and reconstruct approximately 6.9 miles of a paved (asphalt) access road to the Paso Robles Long Range Radar site beginning at the FS boundary at milepost 0.3 and ending at the gate of the FAA radar site at approximately milepost 7.22. The project will also include drainage improvements and provide safety improvements where feasible. The project will consist of a 4-inch full depth reclamation (FDR) of the roadway pavement and 2-inch asphalt overlay. Cleaning or replacement of damaged or missing drainage flumes, cleaning of drainage flumes and culverts, adding embankment material to eroded areas, and installation of delineators and object markers. Roadway cross slopes vary but will be replaced to closely match existing conditions with minor adjustments made to direct runoff to new drainage flume locations. Traffic control will be required to maintain access to radar and communication sites during construction. PRINCIPAL WORK ITEMS: 30301-3000 Shoulder and Ditch Reconditioning 4.5 MILE 30401-1000 Full Depth Reclamation: 7 MILE 40301-0000 Asphalt Concrete Pavement, 6,000 TON 60704-0000 Clean Culvert in Place 67 EACH ESTIMATED COST RANGE: Total estimated cost between $5,000,000 and $10,000,000
From Presolicitation posted on Sep 16, 2025TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: CA ERFO FS LSPDR 2023-1(1B) PROJECT NAME: BLACK MOUNTAIN ROAD PROJECT DESCRIPTION: Black Mountain Road, also known as Paso Robles Radar Road, provides access to the Paso Robles California Air Route Surveillance Radar (ARSR) site, where continuous safe access to the facility is required. From the intersection with the County Road, the lower section of the road is 3.0 miles of Forest Service Road 29S02 (aka Navajo Road). The lower section facilitates public access to campgrounds and other roads within the National Forest. The upper section of the road is 3.9 miles of Forest Service Road 29S10 (aka Black Mountain Road). The upper section only provides access for Federal Aviation Administration (FAA) staff to the radar facility, with a gravel spur road providing access to AT&T and a private antenna site (the South Peak area), and to a few intersecting Off-Highway Vehicle (OHV) trails. PROJECT DETAILS: This project will rehabilitate and reconstruct approximately 6.9 miles of a paved (asphalt) access road to the Paso Robles Long Range Radar site beginning at the FS boundary at milepost 0.3 and ending at the gate of the FAA radar site at approximately milepost 7.22. The project will also include drainage improvements and provide safety improvements where feasible. The project will consist of a 4-inch full depth reclamation (FDR) of the roadway pavement and 2-inch asphalt overlay. Cleaning or replacement of damaged or missing drainage flumes, cleaning of drainage flumes and culverts, adding embankment material to eroded areas, and installation of delineators and object markers. Roadway cross slopes vary but will be replaced to closely match existing conditions with minor adjustments made to direct runoff to new drainage flume locations. Traffic control will be required to maintain access to radar and communication sites during construction. PRINCIPAL WORK ITEMS: 30301-3000 Shoulder and Ditch Reconditioning 4.5 MILE 30401-1000 Full Depth Reclamation: 7 MILE 40301-0000 Asphalt Concrete Pavement, 6,000 TON 60704-0000 Clean Culvert in Place 67 EACH ESTIMATED COST RANGE: Total estimated cost between $5,000,000 and $10,000,000
From Solicitation posted on Oct 21, 2025TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: CA ERFO FS LSPDR 2023-1(1B) PROJECT NAME: BLACK MOUNTAIN ROAD PROJECT DESCRIPTION: Black Mountain Road, also known as Paso Robles Radar Road, provides access to the Paso Robles California Air Route Surveillance Radar (ARSR) site, where continuous safe access to the facility is required. From the intersection with the County Road, the lower section of the road is 3.0 miles of Forest Service Road 29S02 (aka Navajo Road). The lower section facilitates public access to campgrounds and other roads within the National Forest. The upper section of the road is 3.9 miles of Forest Service Road 29S10 (aka Black Mountain Road). The upper section only provides access for Federal Aviation Administration (FAA) staff to the radar facility, with a gravel spur road providing access to AT&T and a private antenna site (the South Peak area), and to a few intersecting Off-Highway Vehicle (OHV) trails. PROJECT DETAILS: This project will rehabilitate and reconstruct approximately 6.9 miles of a paved (asphalt) access road to the Paso Robles Long Range Radar site beginning at the FS boundary at milepost 0.3 and ending at the gate of the FAA radar site at approximately milepost 7.22. The project will also include drainage improvements and provide safety improvements where feasible. The project will consist of a 4-inch full depth reclamation (FDR) of the roadway pavement and 2-inch asphalt overlay. Cleaning or replacement of damaged or missing drainage flumes, cleaning of drainage flumes and culverts, adding embankment material to eroded areas, and installation of delineators and object markers. Roadway cross slopes vary but will be replaced to closely match existing conditions with minor adjustments made to direct runoff to new drainage flume locations. Traffic control will be required to maintain access to radar and communication sites during construction. PRINCIPAL WORK ITEMS: 30301-3000 Shoulder and Ditch Reconditioning 4.5 MILE 30401-1000 Full Depth Reclamation: 7 MILE 40301-0000 Asphalt Concrete Pavement, 6,000 TON 60704-0000 Clean Culvert in Place 67 EACH ESTIMATED COST RANGE: Total estimated cost between $5,000,000 and $10,000,000
From Solicitation posted on Oct 31, 2025TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: CA ERFO FS LSPDR 2023-1(1B) PROJECT NAME: BLACK MOUNTAIN ROAD PROJECT DESCRIPTION: Black Mountain Road, also known as Paso Robles Radar Road, provides access to the Paso Robles California Air Route Surveillance Radar (ARSR) site, where continuous safe access to the facility is required. From the intersection with the County Road, the lower section of the road is 3.0 miles of Forest Service Road 29S02 (aka Navajo Road). The lower section facilitates public access to campgrounds and other roads within the National Forest. The upper section of the road is 3.9 miles of Forest Service Road 29S10 (aka Black Mountain Road). The upper section only provides access for Federal Aviation Administration (FAA) staff to the radar facility, with a gravel spur road providing access to AT&T and a private antenna site (the South Peak area), and to a few intersecting Off-Highway Vehicle (OHV) trails. PROJECT DETAILS: This project will rehabilitate and reconstruct approximately 6.9 miles of a paved (asphalt) access road to the Paso Robles Long Range Radar site beginning at the FS boundary at milepost 0.3 and ending at the gate of the FAA radar site at approximately milepost 7.22. The project will also include drainage improvements and provide safety improvements where feasible. The project will consist of a 4-inch full depth reclamation (FDR) of the roadway pavement and 2-inch asphalt overlay. Cleaning or replacement of damaged or missing drainage flumes, cleaning of drainage flumes and culverts, adding embankment material to eroded areas, and installation of delineators and object markers. Roadway cross slopes vary but will be replaced to closely match existing conditions with minor adjustments made to direct runoff to new drainage flume locations. Traffic control will be required to maintain access to radar and communication sites during construction. PRINCIPAL WORK ITEMS: 30301-3000 Shoulder and Ditch Reconditioning 4.5 MILE 30401-1000 Full Depth Reclamation: 7 MILE 40301-0000 Asphalt Concrete Pavement, 6,000 TON 60704-0000 Clean Culvert in Place 67 EACH ESTIMATED COST RANGE: Total estimated cost between $5,000,000 and $10,000,000
From Solicitation posted on Nov 04, 2025TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: CA ERFO FS LSPDR 2023-1(1B) PROJECT NAME: BLACK MOUNTAIN ROAD PROJECT DESCRIPTION: Black Mountain Road, also known as Paso Robles Radar Road, provides access to the Paso Robles California Air Route Surveillance Radar (ARSR) site, where continuous safe access to the facility is required. From the intersection with the County Road, the lower section of the road is 3.0 miles of Forest Service Road 29S02 (aka Navajo Road). The lower section facilitates public access to campgrounds and other roads within the National Forest. The upper section of the road is 3.9 miles of Forest Service Road 29S10 (aka Black Mountain Road). The upper section only provides access for Federal Aviation Administration (FAA) staff to the radar facility, with a gravel spur road providing access to AT&T and a private antenna site (the South Peak area), and to a few intersecting Off-Highway Vehicle (OHV) trails. PROJECT DETAILS: This project will rehabilitate and reconstruct approximately 6.9 miles of a paved (asphalt) access road to the Paso Robles Long Range Radar site beginning at the FS boundary at milepost 0.3 and ending at the gate of the FAA radar site at approximately milepost 7.22. The project will also include drainage improvements and provide safety improvements where feasible. The project will consist of a 4-inch full depth reclamation (FDR) of the roadway pavement and 2-inch asphalt overlay. Cleaning or replacement of damaged or missing drainage flumes, cleaning of drainage flumes and culverts, adding embankment material to eroded areas, and installation of delineators and object markers. Roadway cross slopes vary but will be replaced to closely match existing conditions with minor adjustments made to direct runoff to new drainage flume locations. Traffic control will be required to maintain access to radar and communication sites during construction. PRINCIPAL WORK ITEMS: 30301-3000 Shoulder and Ditch Reconditioning 4.5 MILE 30401-1000 Full Depth Reclamation: 7 MILE 40301-0000 Asphalt Concrete Pavement, 6,000 TON 60704-0000 Clean Culvert in Place 67 EACH ESTIMATED COST RANGE: Total estimated cost between $5,000,000 and $10,000,000
From Solicitation posted on Nov 06, 2025TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: CA ERFO FS LSPDR 2023-1(1B) PROJECT NAME: BLACK MOUNTAIN ROAD PROJECT DESCRIPTION: Black Mountain Road, also known as Paso Robles Radar Road, provides access to the Paso Robles California Air Route Surveillance Radar (ARSR) site, where continuous safe access to the facility is required. From the intersection with the County Road, the lower section of the road is 3.0 miles of Forest Service Road 29S02 (aka Navajo Road). The lower section facilitates public access to campgrounds and other roads within the National Forest. The upper section of the road is 3.9 miles of Forest Service Road 29S10 (aka Black Mountain Road). The upper section only provides access for Federal Aviation Administration (FAA) staff to the radar facility, with a gravel spur road providing access to AT&T and a private antenna site (the South Peak area), and to a few intersecting Off-Highway Vehicle (OHV) trails. PROJECT DETAILS: This project will rehabilitate and reconstruct approximately 6.9 miles of a paved (asphalt) access road to the Paso Robles Long Range Radar site beginning at the FS boundary at milepost 0.3 and ending at the gate of the FAA radar site at approximately milepost 7.22. The project will also include drainage improvements and provide safety improvements where feasible. The project will consist of a 4-inch full depth reclamation (FDR) of the roadway pavement and 2-inch asphalt overlay. Cleaning or replacement of damaged or missing drainage flumes, cleaning of drainage flumes and culverts, adding embankment material to eroded areas, and installation of delineators and object markers. Roadway cross slopes vary but will be replaced to closely match existing conditions with minor adjustments made to direct runoff to new drainage flume locations. Traffic control will be required to maintain access to radar and communication sites during construction. PRINCIPAL WORK ITEMS: 30301-3000 Shoulder and Ditch Reconditioning 4.5 MILE 30401-1000 Full Depth Reclamation: 7 MILE 40301-0000 Asphalt Concrete Pavement, 6,000 TON 60704-0000 Clean Culvert in Place 67 EACH ESTIMATED COST RANGE: Total estimated cost between $5,000,000 and $10,000,000
From Solicitation posted on Nov 20, 2025Notice history
6-
-
Solicitation Posted Oct 21, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Oct 01, 2025 → Nov 14, 2025
-
Solicitation Posted Nov 04, 2025No changes from previous notice
-
Solicitation Posted Nov 06, 2025No changes from previous notice
-
Solicitation LATEST Posted Nov 20, 2025No changes from previous notice