Contacts, documents and full notice history are available with a subscription.
Presolicitation Expired 2 notices

C4/D5 MOTOR DISPOSAL N0003026R2043

Solicitation N0003026R2043 Copied Notice ID 3deb5807036544c2a28092776fc6e4a5 Copied DEPT OF DEFENSE — STRATEGIC SYSTEMS PROGRAMS
SAM.gov
Posted
Jan 09, 2026
Deadline
Jan 26, 2026
Set-aside
None
NAICS
541330
PSC
R425

Summary

AI-generated · Oct 25, 2025

Dispose, disassemble, and dispose of Trident I (C4) and Trident II (D5) first, second, and third stage motors in support of the Trident Missile Program. The work includes: disassembly at the contractor’s facility, propellant removal, and disposal; periodic examination of C4 propellant fins and C4/D5 motors to study aging; investigations of storage, handling, and transport approaches for these motors; and maintenance/repair of government-owned tooling and equipment used to transport the motors. Motors are to be disassembled and propellant removed at the contractor facility, with components then transported to the Utah Test and Training Range at Hill Air Force Base for disposal. A SECRET facility clearance and a SECRET-cleared computing facility are required.

To respond, firms must submit a concise White Paper capability statement (up to five pages, 12-point Times New Roman) demonstrating minimum qualifications (disassembly, propellant removal, disposal, aging studies, and related transport/handling investigations) and recent, relevant experience performing similar efforts at a comparable scale. Demonstrate capability to manage an IDIQ with CPFF/FFP components, show experience with at least $4.5 million in annual incurred costs on similar work in the last five years, and provide detailed past performance references (prime or subcontractor) with contract data and points of contact. Include required company information and confirm the ability to obtain the necessary security clearances. This is a market research action, not a solicitation, and responses will be evaluated to determine capability for potential future contracting.

4.0 Synopsis This is a SOURCES SOUGHT NOTICE (SSN) announcement. SSNs are issued to assist the Agency in performing market research to determine industry interest and capability. No proposals are being requested or accepted with this synopsis. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Therefore, no proposals are being requested or accepted in response to this SSN. 5.0 Purpose In accordance with (IAW) Federal Acquisition Regulation (FAR) Part 10, SSP is conducting market research to determine if sources are capable of successfully performing the requirements identified in this SSN. Specifically, SSP is seeking capable firms of providing for the disposal of Trident I (C4) or Trident II (D5) First, Second, and Third Stage motors in support of the Trident Missile Program. SSP is seeking concise capability statements (restricted to no more than five 8.5 X 11 inch pages, in a font no smaller than 10 point) which identify the vendor s current capabilities to perform/execute the requirements identified in Section 8.0. Potential sources must have a security clearance, and have demonstrated capability to provide support to the disposal operations at the Utah Test and Training Range located on Hill Air Force Base. This contract would be an IDIQ contract, estimated to be five years. CLINs would be CPFF and FFP. NOTE: Given the highly technical nature of SSP s mission set as a major weapons systems command and corresponding technical requirements, respondents must provide recent and relevant past performance data (as detailed below) to demonstrate and substantiate the respondents ability to successfully execute requirements detailed in this SSN. 6.0 White Paper Capability Statement Credentials a. SSP is seeking detailed, complete, and thorough White Paper capability statements from interested firms who can demonstrate and document, with evidentiary support, that they 1) possess the minimum qualifications and experience identified in paragraph 7.0 which are critical to the successful execution of the requirements, and 2) demonstrate recent and relevant experience, as the Prime contractor (or subcontractor) performing the same/similar efforts of the same/similar scope, size, and complexity to the enclosure (1) SSN SOW requirements identified in paragraph 8.0. Interested firms must demonstrate their existing capability, or potential to acquire the capability, to meet the enclosure (1) SSN SOW requirements by the time of contract award, estimated to be June 2026. 6.1 Small Business Concerns IAW FAR Subpart 19.2 Polices, SSP seeks to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. Small Business Concerns who possess the minimum qualifications and experience identified in paragraph 7.0 and who can demonstrate its concerns capability (or ability to obtain the capability by the contract award date) to execute the complete requirements identified in the enclosure (1) SSN SOW in paragraph 8.0, as well provide the requisite past performance experience detailed in Section 9.0, are encouraged to respond to this SSN. If a small business concern intends to partner with another entity, the small business concern must identify which specific enclosure (1) SOW efforts/tasks it intends to perform, as well as the specific efforts/tasks the partner will perform, with the substantiating data required in this SSN supporting the identified partnering roles and responsibilities. NOTE: 100% of the enclosure (1) SOW and SSN requirements must be addressed in any submitted partnering submittal, if obtainable. NOTE: In the event this contract is set aside for small business concerns, the small business concern agrees that it will be in strict compliance and conformance with the percentage payment limitations for services, supplies, or construction (as applicable) to subcontractors that are not similarly situated entities in accordance with FAR 52.219-14 Limitations on Subcontracting and state such in their response. 7.0 Minimum Qualifications / Experience Requirements Interested firms shall document and submit specific and evidenced / demonstrated possession of the minimum qualifications and experience requirements in the technical areas identified in bullets a through c below which are critical to the successful execution of the enclosure (1) SSN SOW requirements in paragraph 8.0. This experience shall be documented as specified in paragraph 9.0. SSP requires contractor support to perform the following operations on each C4/D5 First Stage, Second Stage, and Third Stage motor: Disassembly operation Propellant Removal operation Disposal operation The contractor will also need to do the following: Periodically examine C4 propellant fins and C4 or D5 motors, provided by the government, for propellant degradation and softening over a two year period in order to better understand propellant aging and motor safety concerns. Conduct investigations, as directed by the Government, to determine the acceptability of various storage, handling, and transportation approaches for C4/D5 motors. Inspect, maintain, repair, modify and document effort associated with Government owned or controlled Special Support Equipment and Tooling needed to transport First, Second, and Third stage fleet ballistic missile rocket motors. 8.0 Description of Requirements See enclosure (1) SSN SOW Requirements. 8.1 Place of Performance The disassembly and propellant removal shall occur at the contractor s facility. The contractor will then transport the components to the Utah Test and Training Range located on Hill Air Force Base for disposal operations. 9.0 Evidentiary Qualifications/Experience Documentation Requirements Interested firms must possess the requisite minimum qualifications and experience identified in paragraph 7.0 and demonstrated relevant and recent experience as it relates to the enclosure (1) SOW requirements in paragraph 8.0. White Paper Capability statements must include all of the content and details identified below: 9.1 Minimum Qualifications / Experience Requirements Validation White Paper Capability statement submissions shall include a discrete section with the heading Minimum Qualifications / Experience Requirements and document, with specific information, each of the minimum qualifications identified in paragraph 7.0. This section may cite contract reference efforts detailed in Table A of paragraph 9.2 below provided that respondents provide context and rationale as to how that contract reference effort(s) demonstrate possession of the applicable Minimum Qualifications / Experience requirements of bullets a through c identified in paragraph 7.0 or have capability of obtaining by contract award. 9.2 Relevant & Recent Experience / Supporting Narratives In addition to demonstrating possession of the requisite Minimum Qualifications / Experience requirements identified in paragraph 7.0 above (or have capability of obtaining by contract award), interested firms shall demonstrate relevant and recent experience performing the same or similar efforts and or completion tasks (as applicable) to the enclosure (1) SSN SOW requirements in paragraph 8.0. Relevant experience is defined as performing efforts/tasks similar in scope, size, and complexity as the enclosure (1) SSN SOW requirements with an annual incurred cost/expense of at least $4.5M. Recent experience is defined as work performed within 5 years of the SSN posting date. To substantiate the performance of relevant and recent efforts/tasks to the enclosure (1) SSN SOW requirements, White Paper Capability statements shall provide a list of current or previous contract references and the efforts/tasks performed thereunder detailing and evidencing a direct correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW using the specific outline provided in Table A below. Submitter s responses to the Table A SSN CLIN SOW outline shall include the following information per individual contract reference: Summary of relevant work performed and how that specific work demonstrates capability to perform the specific requirements identified in the enclosure (1) SSN SOW requirements; Current / Prior Contract Number(s) and Customer/Agency Supported; Identification of your role as the Prime or Subcontractor; Contract Type; Period of performance of the specific contract reference effort performed; Quantity of FTE personnel utilized on the specific contract reference effort, per annum, with distinction and FTE quantities identified between the respondents FTE employees and any subcontractor FTE employees; Net Dollar value (base and options) for each contract reference and the Annual Incurred costs for each contract reference provided which demonstrates the magnitude of those contract references in comparison to the annual estimated value cited in paragraph 9.2 above. NOTE: solely citing an IDIQ ceiling amount or base and all options aggregate value without the annual incurred costs for the submitted contract reference(s) is NOT acceptable amounts must be specific to the actual incurred costs for a Contract CLIN(s) or Individual Task Order(s), for the contract reference(s) cited in Table A below; and Customer point of contact with valid phone number and email. TABLE A SUMMARY OF RELEVANT & RECENT WORK EXPERIENCE SSN SOW CLIN Requirement Contract Reference(s) Summary Document the specific correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW CLIN efforts/tasks 0001 Program Management Support 0002 FS, SS, and TS Disassemble and Inspection, D5 SS and TS Motor Transport, and SS and TS Motor Storage, and Disposal 0003 D5 Tool, Hardware & Special Studies 0004 D5 Fleet Returned Motor Aging Studies 0005 D5 FS, SS & TS Motor Receipt and Processing FS Motor Transport, Storage, and Disposal 0006 Contract Data Requirements List(CDRLs) 0007 Contractor Acquired Property (CAP) 10.0 Company Information and Deadline for Submittal White Paper Capability statements shall be submitted in Microsoft Word for Office 2000 compatible format or PDF format and are due no later than 04 November 2025, 4:00pm EST. The White Papers shall not exceed 5 pages in total, using 12-point Times New Roman and 1 margin and shall be submitted via e-mail to Amanda.Beall@ssp.navy.mil. NOTE: The page count, font size, and margin requirements apply to the entire SSN response, to include any Cover Page, Attachments, Headers, Footers, etc. excluding the Company Administrative Information below. The Government is seeking detailed content and responses to the SSN requirements over any promotional details, pictures, etc. ALL White Paper Capability submittals shall include the following Company Administrative Data which is NOT included in the aforementioned maximum 5-page limit: Company Administrative Information Company Name: Company Point of Contact (email and phone) and Title: Company Address: Unique Entity Identifier (UEI) No: Cage Code: Size of business, including; total annual revenue, by year, for the past five years and number of employees; Ownership, including whether: small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns; Number of years in business; Identification of the current security clearance held at your facility that will provide support to the enclosure (1) SOW requirements. NOTE: Work to be performed under this contract shall require the contractor to have a facility clearance of SECRET and a computing facility that is cleared to process SECRET data. Respondents to this SSN shall indicate which portions of their response are proprietary/business sensitive and should mark them accordingly. It is the responsibility of the SSN respondent to monitor the sam.gov website for additional information pertaining to any potential acquisition. 11.0 Government Assessment The White Paper Capability statement responses to this SSN must meet the requirements stated in the SSN and will be reviewed to determine whether each respondent is capable of performing the requirements. This review will be based solely on the specific data and supporting content provided by the respondents in their White Paper Capability statement submissions and responses to any follow on clarification inquires submitted by the Government. Incomplete or generalized White Paper Capability statements, without specificity as it relates to the SSN content requirements, omitted content, or content which fails to address all of the requirements of this SSN, will have a direct affect upon the Government s assessment of the White Paper submittal. The Government s assessment will include, but is not limited to, the following: (1) The respondent s specific and evidenced / demonstrated possession of the Minimum Qualifications / Experience requirements identified in paragraph 7.0; (2) The respondent s demonstrated ability to manage, as a Prime or Subcontractor, the types and magnitude of requirements identified in the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity; (3) The respondent s demonstrated technical ability, as a Prime or Subcontractor, to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity; and (4) The respondent s demonstrated capacity to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts in terms of scope, size, and complexity, the quantity of personnel required, and the contract award date. 12.0 SSN Disclaimer This SSN is issued solely for Market Research purposes. It does not constitute a Request for Proposal (RFP) nor a promise to issue an RFP in the future. This SSN does not commit the Government to solicit or award a contract. The information provided in the SSN is subject to change and is not binding on the Government. Respondents are advised that ALL costs associated with responding to this SSN, including any requests for follow-up information, will be solely at the interested parties expense and the Government will not pay for any information or costs incurred or associated with submitting a SSN White Paper Capability statement or follow-on responses. The Government reserves the right to consider a set-aside for small businesses or one of the small business preference groups. (e.g., small business, service-disabled veteran-owned small business, 8(a), HUBZone small business, and women-owned small business programs).

From Sources Sought posted on Oct 24, 2025

This procurement will provide for the disposal of TRIDENT II (D5) first stage (FS), second stage (SS), or third stage (TS) rocket motors. In addition the Contractor will upgrade selected Government-owned equipment that support the disposal process, which will include the following: documentation of disposal plans and environmental assessments, temporary storage of motors, nozzles and igniters received from other Fleet Ballistic Missile (FBM) storage sites, preparation of motors for shipment to Hill AFB, and support of Hill AFB personnel in the actual motor disposal and testing operations regarding transportation, unloading, removing static electricity, and placement of motors for disposal and testing. The contractor will also perform aging studies to include destructive and nondestructive evaluations, and develop tooling and procedures to remove propellant samples from D5 FS, SS, and TS fleet-returned motors. Pursuant to the authority of 10 U.S.C. 2304 (c)(1) the Government intends to conduct negotiations with Northrop Grumman Systems Corporation (NGSC), Magna, Utah 84044-2202. Performance will take place from Fiscal Year (FY)26 through FY30. NGSC is the only known source that currently has the facilities, equipment, and expertise in TRIDENT II necessary for the handling and disposal of these rocket motors. This Notice of intent is not a request for competitive proposals. The proposed contract action is for supplies and services for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302. Interested persons may identify their interest and capability to respond to the requirement or submit proposals. This notice of intent is not a request for competitive proposals. All responses must be received within fifteen days from the date of publication of this synopsis. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.

From Presolicitation posted on Jan 09, 2026

Notice history

2
  1. Sources Sought Posted Oct 24, 2025 View
  2. Presolicitation LATEST Posted Jan 09, 2026
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Response Deadline: Nov 04, 2025Jan 26, 2026

Details

Solicitation number N0003026R2043
Notice ID 3deb5807036544c2a28092776fc6e4a5
Notice type Presolicitation
Product / Service (PSC) R425
NAICS 541330
Place of performance Magna, Utah
Archive date Feb 10, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Amanda Beall

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
SSP
STRATEGIC SYSTEMS PROGRAMS

Place of Performance

Magna, Utah
USA

Dates

Posted Jan 09, 2026 6 months ago
Last Updated Aug 06, 2026 2 days ago
Due Jan 26, 2026 6 months ago