C222--Provide Emer Power to 3rd Floor Labs 558-24-109 36C24625R0042
Summary
AI-generated · Aug 23, 2025Provide emergency power for the third-floor laboratories, with the requirement to submit SF330s from qualified architectural/engineering firms. The capacity narrative now requires a draft schedule that aligns with a 243-calendar-day period of performance (replacing the previous 236-day reference).
This modification removes the signatory authority language from the Professional Qualifications section and extends the SF330 submission deadline to a later date.
This modification extends the request for SF330s response to July 10, 2025 @ 10am. Removal of the signatory authority language under the Professional qualifications section. Clarification: Capacity section has language to provide a draft schedule for 236 calendar days. This has been changed to provide a draft schedule IAW the 243-calendar day period of performance.
From Presolicitation posted on Jun 26, 2025This Amendment is a notification. The Durham VAMC will not move forward to solicit (36C24625R0042_4 /Provide Power to the 3rd Floor Lab) at this time. The requirement will be solicited at a later date.
From Presolicitation posted on Sep 29, 2025Notice history
2-
Presolicitation Posted Jun 26, 2025
-
Presolicitation LATEST Posted Sep 29, 2025View changes (3)
- Title: C222--Provide Emer Power to 3rd Floor Labs 558-24-109 → C222--Amendment to cancel before solicitation Provide Emergency Power 3rd Floor Labs
- Description: Description was updated
- Response Deadline: Jul 10, 2025 → Not set
Details
Award Information
Contacts
Contracting Officer
Phone
Agency
Place of Performance
508 Fulton Street
Durham, NC 27705