C1DA--Project 674-23-254 - AE Correct B163 Loading Dock 36C25726AP1698
Summary
AI-generated · Mar 09, 2026Reconfigure the Main Hospital Loading Dock to improve the flow and safety of delivery vehicles to the facility. This is an AE correction project for the B163 Loading Dock. Two separate awards were issued on March 3, 2026, each for $315,429.78, to ENAPAY, LLC, for this project (totaling $630,859.56).
Reconfigure the Main Hospital Loading Dock to improve the flow and safety of delivery vehicles to the facility.
From Award Notice posted on Mar 03, 2026Notice history
2-
Award Notice Posted Mar 03, 2026
-
Award Notice LATEST Posted Mar 03, 2026
Details
Award Information
Award Notices
Posted: Mar 03, 2026
Reconfigure the Main Hospital Loading Dock to improve the flow and safety of delivery vehicles to the facility.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ENAPAY, LLC | U6VXMDFKVL98 | 796Y0 | MESQUITE |
Contacts
Contract Specialist
Phone