C--Honolulu Weather Forecast Office (WFO) relocation 1305M225R0053
Summary
AI-generated · Aug 24, 2025Provide architectural and engineering design, build/remodel, and construction oversight services to relocate the Honolulu Weather Forecast Office to the Daniel K. Inouye Regional Center on Ford Island, converting unused IRC space into a functional WFO Operations area. The arrangement aims to realize cost savings by using a NOAA building with available space rather than engaging a GSA lease, thereby reducing upgrades to the current WFO and avoiding GSA fees.
Contract type is firm-fixed price with labor-hour components, covering A&E design/build/remodel work and construction oversight for converting the IRC space into the WFO Operations area.
This is a combines synopsis and solicitation for a firm/fixed price and labor hour contract for the National Weather Service (NWS) for Architecture and Engineering Design and Construction Oversight for the relocation of the Honolulu Weather Forecast Office (WFO) to the Daniel K. Inouye Regional Center (IRC) on Ford Island. The move is being conducted to save money for the NWS since the IRC is a NOAA building that currently has open space. The NWS will not have to use the General Service Administration (GSA) as a third party lease designator saving the NWS significant savings in upgrades to the current WFO and well as GSA fees. This Acquisition and the associated Requirement will be to hire an Architectural and Engineering (A&E) firm to design/build/remodel the IRC in order to convert the empty space into a location that the WFO Operations area can utilize.
From Combined Synopsis/Solicitation posted on Aug 12, 2025This is a combines synopsis and solicitation for a firm/fixed price and labor hour contract for the National Weather Service (NWS) for Architecture and Engineering Design and Construction Oversight for the relocation of the Honolulu Weather Forecast Office (WFO) to the Daniel K. Inouye Regional Center (IRC) on Ford Island. The move is being conducted to save money for the NWS since the IRC is a NOAA building that currently has open space. The NWS will not have to use the General Service Administration (GSA) as a third party lease designator saving the NWS significant savings in upgrades to the current WFO and well as GSA fees. This Acquisition and the associated Requirement will be to hire an Architectural and Engineering (A&E) firm to design/build/remodel the IRC in order to convert the empty space into a location that the WFO Operations area can utilize.
From Combined Synopsis/Solicitation posted on Aug 18, 2025This is a combines synopsis and solicitation for a firm/fixed price and labor hour contract for the National Weather Service (NWS) for Architecture and Engineering Design and Construction Oversight for the relocation of the Honolulu Weather Forecast Office (WFO) to the Daniel K. Inouye Regional Center (IRC) on Ford Island. The move is being conducted to save money for the NWS since the IRC is a NOAA building that currently has open space. The NWS will not have to use the General Service Administration (GSA) as a third party lease designator saving the NWS significant savings in upgrades to the current WFO and well as GSA fees. This Acquisition and the associated Requirement will be to hire an Architectural and Engineering (A&E) firm to design/build/remodel the IRC in order to convert the empty space into a location that the WFO Operations area can utilize.
From Combined Synopsis/Solicitation posted on Aug 26, 2025The National Weather Service (NWS) will be moving the Honolulu Weather Forecast Office (WFO) to the Daniel K. Inouye Regional Center (IRC) on Ford Island. The move is being conducted to save money for the NWS since the IRC is a NOAA building that currently has open space. The NWS will not have to use the General Service Administration (GSA) as a third party lease designator saving the NWS significant savings in upgrades to the current WFO and well as GSA fees. This Acquisition and the associated Requirement will be to hire an Architectural and Engineering (A&E) firm to design/build/remodel the IRC in order to convert the empty space into a location that the WFO Operations area can utilize.
From Award Notice posted on Sep 19, 2025Notice history
4-
Combined Synopsis/Solicitation Posted Aug 12, 2025
-
Combined Synopsis/Solicitation Posted Aug 18, 2025No changes from previous notice
-
Combined Synopsis/Solicitation Posted Aug 26, 2025View changes (1)
- Response Deadline: Aug 22, 2025 → Sep 02, 2025
-
Award Notice LATEST Posted Sep 19, 2025
Details
Award Information
Award Notices
Posted: Sep 19, 2025
The National Weather Service (NWS) will be moving the Honolulu Weather Forecast Office (WFO) to the Daniel K. Inouye Regional Center (IRC) on Ford Island. The move is being conducted to save money for the NWS since the IRC is a NOAA building that currently has open space. The NWS will not have to us...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ECH ARCHITECTURE PS | RC7JGU7RMQT4 | 050Q5 | Seattle, WA |