C-17 Air Mobility Command Airlift Recapitalization Strategy C-17_AMC_Airlift_Recapitalization_Strategy
Summary
AI-generated · Nov 20, 2025Maintain uninterrupted inter-theater airlift capacity during fleet recapitalization by planning NGAL to replace current C-5M and C-17A fleets in a one-for-one sequence. An accelerated NGAL Analysis of Alternatives will be conducted, with the first NGAL aircraft produced as soon as feasible and IOC anticipated once capable; NGAL will replace a C-5M one-for-one until the fleet is retired, then replace the C-17A one-for-one as well.
To mitigate risks from potential acquisition delays, funding uncertainties, or technical challenges, the current C-5M and C-17A fleets must remain operationally viable until NGAL is fully fielded, which may require extending service life and associated Military Type Certificate (MTC) approvals. No bidding specifics are provided in this notice, but the emphasis is on strategic planning to preserve airlift capability through the transition.
Uninterrupted inter-theater airlift capacity is paramount for global operations during fleet recapitalization. Current recapitalization projections require C-5M viability until 2045 and C-17A viability through 2075. Next Generation Airlift (NGAL) will replace both the C-5M and C-17A fleets as the next inter-theater airlift platform. With an accelerated NGAL Analysis of Alternatives (AoA) in FY27 and an uninterrupted acquisition process with consistent funding, the first NGAL aircraft could be produced as early as FY38. It is estimated the NGAL program will reach Initial Operational Capability (IOC) in FY41. One NGAL aircraft will replace one C-5M aircraft until the entire C-5M fleet is retired. Then, the C-17A fleet will be replaced by NGAL at a one-for-one swap. To mitigate risks associated with acquisition delays, funding uncertainties, or technological challenges, the existing C-5M and C-17A fleets operational viability must be maintained until a fully capable replacement is fielded, which may require extending the service life and associated Military Type Certificate (MTC) of each platform.
From Special Notice posted on Nov 19, 2025Notice history
1-
Special Notice LATEST Posted Nov 19, 2025
Details
Award Information
Not yet awarded