C-1 Hangar Repairs N6945025F1201
Summary
AI-generated · Aug 24, 2025Replace exterior ladders across the C-1 Hangar, replace the gutters on the south side in two designated areas, and replace the existing 150-kilowatt generator. The work is intended to improve operational resilience and structural integrity to ensure long-term capability, safety, and compliance with current standards, with the contractor supplying all labor, materials, equipment, and engineering services.
A Florida Licensed Professional Engineer must be engaged for the project (as the DOR). All work must follow Unified Facilities Criteria and applicable regulations. Note that the Transite Panels/Siding contains asbestos insulation; precautions are required when penetrating the siding, and any related fasteners must be contained and disposed of per government approval and procedures.
This project is located at the C-1 Hangar situated on Trumbo Point Annex, part of Naval Air Station Key West, Florida. The C-1 Hangar is a critical facility supporting a variety of operational and maintenance functions for tenant commands. Due to its coastal location and age, several building systems and components have deteriorated and need replacement to maintain safe and reliable functionality. The tasks for this include all exterior ladders to be replaces, gutters on the south side of the facility in two designated areas to be replaced, and replacement of the existing 150-kilowatt generator. This project includes multiple tasks focused on improving the operational resilience and structural integrity of the facility. All work shall be completed in accordance with applicable Unified Facilities Criteria (UFC), and other relevant federal, state, and local regulations. The Contractor shall furnish all labor, materials, equipment, and engineering services necessary to complete the tasks as specified. The Contractor shall engage a Florida Licensed Professional Engineer as the (DOR). The intent of this project is to ensure long-term operational capability, enhance safety, and bring key systems into compliance with current standards. The Contractor shall be aware that the Transite Panels/Siding contains insulation on the backing that is fiberous that contains Asbestos. Precautions must be taken while working to remove and install anything that penetrates the siding. These fasteners must be contained and retained for Asbestos disposal in compliance with Government approval and procedures.
From Award Notice posted on Aug 15, 2025Notice history
1Details
Award Information
Award Notices
Posted: Aug 15, 2025
This project is located at the C-1 Hangar situated on Trumbo Point Annex, part of Naval Air Station Key West, Florida. The C-1 Hangar is a critical facility supporting a variety of operational and maintenance functions for tenant commands. Due to its coastal location and age, several building system...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| THE BLACKLEDGE GROUP, INC. | WN7DJM2HWNY4 | 89BE2 | Jacksonville Beach, FL |
Agency
Place of Performance
USA