Byrne Service Elevator Design Refresh & CA Services 47PC5126C0012
Summary
AI-generated · Jun 23, 2026Provide a design refresh and Construction Administration Services for a Byrne Service Elevator project, Phases 1 through 4, based on specifications and drawings that are signed and sealed by Henry Adams.
The work must adhere to those Henry Adams documents as the governing design authority for both the design refresh and construction administration across all phases.
The services to be performed include a design refresh and Construction Administration Services, Phase 1 through Phase 4, of a project using specifications and drawings signed and sealed by Henry Adams.
From Justification posted on Jun 22, 2026Notice history
1-
Justification LATEST Posted Jun 22, 2026
Details
Award Information
Contacts
Agency
Place of Performance
USA