Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation BICiv Expired 1 notice 1 document

BUY INDIAN SET ASIDE - WEWOKA IHS FIRE ALARM MONITORING AND INSPECTIONS IHS1516948

Solicitation IHS1516948 Copied Notice ID 5e47aad06c374cf49b0763176a58b097 Copied HEALTH AND HUMAN SERVICES, DEPARTMENT OF — OK CITY AREA INDIAN HEALTH SVC
SAM.gov
Posted
Aug 19, 2025
Deadline
Aug 22, 2025
Set-aside
BICiv
NAICS
561621
PSC
6350

Summary

AI-generated · Aug 24, 2025

Provide 24/7 monitoring of fire alarm and sprinkler systems at the Wewoka Indian Health Center and perform ongoing inspections for two facilities (Administration Building and Clinic Building). The contractor shall supply labor, transportation, equipment, and supplies to support continuous monitoring and to perform scheduled testing: quarterly tamper switch checks, semi-annual water flow tests, and annual inspections of the main fire alarm panel, annunciator, addressable smoke sensors, pull stations, and audio/visual notification devices in both buildings.

Additionally, conduct quarterly wet sprinkler system tests and inspections (tamper, flow, gate valve, fire department connections, and main drain) at the Administration Building; deliver 24/7 monitoring, and provide detailed inspection reports listing device locations with updated information and references to environmental care and The Joint Commission. Include travel costs, and perform standpipe sprinkler gauge checks every five years in accordance with NFPA 25.

1. PURPOSE OF THE PROJECT The Oklahoma City Area Office (OCA), Indian Health Services (IHS) has a requirement for Wewoka Indian Health Center for the monitoring and inspections of the fire alarms and sprinkler system 2. DETAILED DESCRIPTION OF THE TECHNICAL REQUIREMENTS The Contractor shall provide labor, transportation, equipment, supplies, needed to perform monitoring 7 days a week and 24 hours a day as well as quarterly inspections for tamper switch, semi-annual inspection of water flow test, and annual inspection of main fire alarm panel at the at the Wewoka Indian Health Center, Wewoka, Oklahoma. List of all components of both buildings: Administration Building 1-Notifier Fire Alarm Panel -Annual 1- Annunciator-Annual 1- Smoke Sensor Addressable- Annual 4-Pull Station -Annual 13- Audio/Visual Addressable-Annual 2-Water Flow Test Semi-Annual 2- Tamper Switch Quarterly 1- Wet System Test & Inspect Quarterly (Includes Tamper, Flow, Gate Valve, Fire Dept. Connection plastic caps, Valve Trim & Main Drain) 1-Fire department connection- Quarterly 1- Backflow System- Backflow Preventer-Annual Clinic Building 1- Fire Alarm Panel- Annual 2- Smoke Detector Conventional-Annual 9- Pull Station-Annual 19- Audio/Visual Notification Conventional-Annual 3. PERIOD OF PERFORMANCE The base year Period of Performance will be 12 months from date of award with four (4) twelve (12) month option years. 4. LEVEL OF EFFORT 4.1. The Contractor shall provide Quarterly inspections of tamper switches for sprinkler system located in the administration building at the Wewoka Indian Health Center. 4.2. The Contractor shall provide Semi-annually water flow test located at the administration building at the Wewoka Indian Health Center. 4.3 The Contractor shall Annual inspection for main fire alarm panel, annunciator, smoke sensor addressable, pull stations, audio-visual unit addressable located in the administration building and in the main clinic building located at the Wewoka Indian Health Center. 4.4 The Contractor shall Quarterly inspection for sprinkler test and inspection for wet sprinkler system, tamper, flow, gate valve, fire department connections and main drain valve located in the administration building, Wewoka Indian Health Center. 4.5 The Contractor shall Provide 24/7 fire alarm monitoring services for Wewoka Indian Health center. 4.6 The Contractor shall provide Detailed report of all inspections with locations of pull stations, audio/visual with up-dated information with quarterly inspections and referencing environmental care and The Joint Commission in the report. 4.7 The Contractor shall provide all travel costs and associated expenses to and from the Wewoka Indian Health Center. 4.8 The Contractor shall provide Stand pipe sprinkler gauge every 5 years according to NFPA 25 and it is due in 2026.

From Combined Synopsis/Solicitation posted on Aug 19, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Aug 19, 2025 View

Details

Solicitation number IHS1516948
Notice ID 5e47aad06c374cf49b0763176a58b097
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6350
NAICS 561621
Place of performance Wewoka, Oklahoma
Archive date Sep 06, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Mary Ann Yocham

Email

Phone

4059513771

Agency

HEALTH AND HUMAN SERVICES, DEPARTMENT OF
INDIAN HEALTH SERVICE
OK CITY AREA INDIAN HEALTH SVC

Place of Performance

Wewoka, Oklahoma 74884
USA

Dates

Posted Aug 19, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 22, 2025 11 months ago