Building 602 Access Control System FA480025Q0032
Summary
AI-generated · Sep 08, 2025Provide and install a complete Lenel Head End Access Control System for Building 602 at Joint Base Langley AFB under a firm-fixed-price contract. This is a 100% small business set-aside. The work includes placing the new ACS enclosure adjacent to the Fire Alarm System on the first floor and a workstation on the second floor per the owner's instructions, plus all labor, software, materials, and components needed for a complete, operable system. Cabling must be properly supported, with above-ceiling runs in appropriate support, and below-ceiling runs in raceways. The period of performance is one base year with four one-year option periods. Attachments contain the detailed synopsis/solicitation documents.
Combined Synopsis and Solicitation for Building 602 Access Control System The 633d Contracting Squadron is soliciting a Firm-Fixed Price contract for Building 602 Access Control System for Joint Base Langley Air Force Base. This procurement will be a 100% small business set-aside. The period of performance will be for one base year and four one-year option periods. The contractor shall provide and install complete Lenel Head End ACS system. The new ACS Enclosure is to be located adjacent to the Fire Alarm System on First Floor. The new ACS Workstation is to be located on Second Floor Per Owners Instructions. Installation to include all labor, software, materials and components as necessary for a complete and operable system. All cabling will be supported properly and installed above the drop ceiling. All cabling will be installed within raceway when installed below the ceiling. Please see attachments for synopsis/solicitation documents.
From Combined Synopsis/Solicitation posted on Sep 05, 2025Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Sep 05, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA