AI-generated · Feb 27, 2026Interior renovations in Building 51 at the NIST Boulder Campus, totaling about 1,500 square feet of flooring replacement and 1,500 square feet of interior wall painting. Work includes removing and replacing carpet tile, VCT, cove base, and transition strips; installing new ESD VCT in designated restrooms; installing carpet tile in offices and common areas; installing new cove base and thresholds; and preparing and painting corridor walls, door frames, and designated safety markings. Substrate prep, wall patching, and surface prep are required, along with relocating furniture and equipment (including security equipment) and performing daily cleanup. Night and weekend work is required to avoid disruption to building security operations.
Contractor to provide all labor, materials, supervision, construction management, and safety equipment. Deliverables to be submitted for approval include a site-specific Safety Plan, project schedule, product specifications, and an emergency egress plan. Work will be performed at the NIST Boulder Campus, Boulder, CO, with an anticipated project duration of four months from the date of award.
The National Institute of Standards and Technology (NIST), Boulder Campus, anticipates a requirement for interior renovations in Building 51 consisting of approximately 1,500 square feet of flooring replacement and 1,500 square feet of interior wall painting. The project scope includes removal and replacement of existing carpet tile, VCT, cove base, and transition strips; installation of new ESD VCT in designated restrooms; installation of carpet tile in office and common areas; installation of new cove base and thresholds; and preparation and painting of interior corridor walls, door frames, and designated safety markings. Work also includes substrate preparation, wall patching and surface preparation, furniture and equipment relocation (including security equipment), and daily cleanup. The contractor shall provide all labor, materials, supervision, construction management, and safety-related equipment necessary to complete the work. Night and weekend work will be required to avoid disruption to building security operations. The contractor must submit and obtain approval of required deliverables including a site-specific Safety Plan, project schedule, product specifications, and an emergency egress plan. Work will be performed at the NIST Boulder Campus, 325 Broadway, Boulder, CO. The anticipated period of performance is four (4) months from date of award.
From Sources Sought posted on Feb 26, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA