Contacts, documents and full notice history are available with a subscription.
Presolicitation SBA Expired 2 notices 4 documents

Building 1916-T2 Stormwater Drainage Repair and Parking Lot Asphalt Re-sealing Project D9HFSCYSX833

Solicitation D9HFSCYSX833 Copied Notice ID 6f2c60c488384f6b855d9e41c1a0f151 Copied ENERGY, DEPARTMENT OF — SC OAK RIDGE OFFICE
SAM.gov
Posted
Oct 29, 2025
Deadline
Oct 31, 2025
Set-aside
SBA
NAICS
N/A
PSC
Z2LZ

Summary

AI-generated · Oct 25, 2025

RFI seeking capabilities to restore and enhance the functionality, safety, and appearance of the asphalt parking areas and address stormwater drainage at Building 1916-T2, 230 Warehouse Road, Oak Ridge, Tennessee. Vendors may submit a capabilities statement with the RFI; proposals will not be accepted at this time.

Main requirements include: 1) Durable asphalt surface restoration (thorough prep, vegetation removal, crack sealing, patching, and two layers of sealer on designated areas including the ramp); 2) Clear parking lot markings (re-stripe spaces in white, no-parking areas in yellow hatch, paint handicap symbols, and add "COMPACT" lettering as indicated on drawings); 3) Stormwater drainage functionality (remove concrete for new concrete placement and compact gravel/broken pavement as necessary to restore/enhance drainage along the Warehouse Road side); 4) Specific structural and accessory repairs (replace the damaged awning column at Bay 3’s handicap ramp and install three parking bumper wheel stops near Bay 3’s handicap ramp).

The Department of Energy (DOE) is issuing a Request for Information (RFI) only and will not accept any proposals at this time. If the vendors wish to do so, they may submit a capabilities statement along with the RFI. This RFI is for the services to restore and enhance the functionality, safety, and appearance of the asphalt parking areas and address stormwater drainage issues at Building 1916-T2, located at 230 Warehouse Road, Oak Ridge, Tennessee 37830. The overall goal for this project is to achieve a restored and re-sealed asphalt parking lot with clearly marked parking spaces, functional stormwater drainage, and specific structural repairs, all executed in accordance with prevailing industry standards, applicable codes, and DOE requirements. The main reqirements for this project are listed below: Item 1: Achieve Durable Asphalt Surface Restoration. Performance Standard: The contractor shall thoroughly prepare all asphalt surfaces, remove vegetation, seal cracks, patch areas as specified, and apply two layers of asphalt sealer to all designated areas, including the asphalt ramp, to create a durable, sealed surface. Item 2: Implement Clear and Compliant Parking Lot Markings. Performance Standard: The contractor shall re-stripe all parking spaces in white, no-parking hatched areas in yellow, paint handicap symbols, and add "COMPACT" lettering as indicated on the provided drawings. Item 3: Ensure Effective Stormwater Drainage Functionality. Performance Standard: The contractor shall remove concrete for new concrete placement and compact gravel/broken pavement as necessary to restore and enhance stormwater drainage along the Warehouse Road side of Building 1916-T2. Item 4: Complete Specific Structural and Accessory Repairs. Performance Standard: The contractor shall replace the damaged awning column at Bay 3's handicap ramp and install three parking bumper wheel stops at the indicated spaces near Bay 3's handicap ramp.

From Presolicitation posted on Oct 24, 2025

The Department of Energy (DOE) is issuing a Request for Information (RFI) only and will not accept any proposals at this time. If the vendors wish to do so, they may submit a capabilities statement along with the RFI. This RFI is for the services to restore and enhance the functionality, safety, and appearance of the asphalt parking areas and address stormwater drainage issues at Building 1916-T2, located at 230 Warehouse Road, Oak Ridge, Tennessee 37830. The overall goal for this project is to achieve a restored and re-sealed asphalt parking lot with clearly marked parking spaces, functional stormwater drainage, and specific structural repairs, all executed in accordance with prevailing industry standards, applicable codes, and DOE requirements. The main reqirements for this project are listed below: Item 1: Achieve Durable Asphalt Surface Restoration. Performance Standard: The contractor shall thoroughly prepare all asphalt surfaces, remove vegetation, seal cracks, patch areas as specified, and apply two layers of asphalt sealer to all designated areas, including the asphalt ramp, to create a durable, sealed surface. Item 2: Implement Clear and Compliant Parking Lot Markings. Performance Standard: The contractor shall re-stripe all parking spaces in white, no-parking hatched areas in yellow, paint handicap symbols, and add "COMPACT" lettering as indicated on the provided drawings. Item 3: Ensure Effective Stormwater Drainage Functionality. Performance Standard: The contractor shall remove concrete for new concrete placement and compact gravel/broken pavement as necessary to restore and enhance stormwater drainage along the Warehouse Road side of Building 1916-T2. Item 4: Complete Specific Structural and Accessory Repairs. Performance Standard: The contractor shall replace the damaged awning column at Bay 3's handicap ramp and install three parking bumper wheel stops at the indicated spaces near Bay 3's handicap ramp.

From Presolicitation posted on Oct 29, 2025

Notice history

2
  1. Presolicitation Posted Oct 24, 2025 View
  2. Presolicitation LATEST Posted Oct 29, 2025
    No changes from previous notice

Details

Solicitation number D9HFSCYSX833
Notice ID 6f2c60c488384f6b855d9e41c1a0f151
Notice type Presolicitation
Product / Service (PSC) Z2LZ
Place of performance Oak Ridge, Tennessee
Archive date Nov 01, 2025

Award Information

Not yet awarded

Contacts

primary
Beth Disney

Email

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
SC OAK RIDGE OFFICE

Place of Performance

Oak Ridge, Tennessee 37831
USA

Dates

Posted Oct 29, 2025 9 months ago
Last Updated Aug 06, 2026 2 days ago
Due Oct 31, 2025 9 months ago