AI-generated · Aug 23, 2025Phase I repairs to Building 110, Big Gun Shop, at Watervliet Arsenal, NY, will be delivered under a two-phase design-build contract. The work spans substructure (patching and leveling the concrete slab, trench repair), shell (exterior brick repair, replacement of exterior doors and hardware, roofing repairs), interiors (main bay area work excluding offices/labs, interior window refurbishment, brick repair, signage replacement, painting), services (upgrades and repairs to compressed air, domestic water, steam distribution, standpipe, fire suppression, and electrical systems to support upgrades/repairs), and special construction/demolition (demolition to support repairs, hazardous materials abatement, sustainability requirements). The procurement uses a firm-fixed-price, two-phase Best Value Trade Off process under FAR 15.101-1, with a path to award to the responsible firm offering the best overall value. It is an unrestricted competition with Hubzone price preference, and the project will require a Project Labor Agreement (PLA); compliance with FAR Subpart 22.503 and FAR 52.222-33 Alternate I is required, with award contingent on full PLA compliance prior to award.
No changes or new information appear across the notices; the records are identical in scope and requirements, including the PLA requirement, competition framework, and proposal timing.
Background This project will be the Phase I Repairs to Building 110, Big Gun Shop. Building 110 is a 213,799 square foot industrial and manufacturing building, hosting numerous manufacturing processes in a partial 2?story, red brick, modified rectangular plan. Ceilings in production areas are open to the underside of roof structure with top of roofs ranging from 35 to 117 feet high. This Phase I will be a design build contract. Work will consist of, but not limited too, that following: Substructure (Patch and Level Existing Concrete Slab, Trench Repair); Shell (Exterior Brick Repair, Replacement of Exterior Doors and Door Hardware, Roofing Repairs); Interiors (Main Bay Area Excluding Offices/Labs) (Interior Window Refurbishment, Repair Interior Brick, Replacement of Signage, Painting Interior Walls/Partitions/Ceilings); Services (Compressed Air System Repairs and Upgrades, Domestic Water Repairs, Steam Distribution System Repairs, Standpipe Systems Repairs, Fire Suppression Systems Repairs, Electrical Repairs in Support of System Upgrades/Repairs); Special Construction and Demolition (Demolition to Support Repair Work, Abatement of Hazardous Materials to Support Repair Work, Sustainability Requirements in Support of Phase 1 Repairs) Acquisition Strategy This is a Design-Build (DB) firm-fixed- price contract resulting for a two-phase "Best Value Trade Off" Selection Procedure in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for the Repair Building 110, Big Gun Shop Phase I located at Watervliet Arsenal, NY. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The NAICS Code is 236220 (Commercial and Institutional Building Construction) Magnitude: $25M-$100M This project is a Unrestricted Full and Open Competition with Hubzone Price Preference PHASE ONE PROPOSAL ARE DUE BY 23 JULY 2025 AT 4 P.M. EASTERN DAYLIGHT TIME. NOTE: THIS ACQUISITION WILL INVOLVE A PROJECT LABOR AGREEMENT (PLA). PLEASE REFERENCE THE FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY FOR FURTHER INFORMATION ABOUT PLAS. FAR CLAUSE 52.222-33 ALTERNATE I IS USED (ONLY THE APPARENT SUCCESSFUL SUBMITS ITS PLA, PRIOR TO AWARD). THE SUBMISSION WILL BE REVIEWED FOR COMPLIANCE WITH ALL STATUTES, REGULATIONS, E.O.S, AND AGENCY REQUIREMENTS. AWARD SHALL NOT BE MADE UNTIL THE PLA IS FULLY COMPLIANT WITH THE CONTRACT REQUIREMENTS.
From Solicitation posted on Jun 26, 2025Background This project will be the Phase I Repairs to Building 110, Big Gun Shop. Building 110 is a 213,799 square foot industrial and manufacturing building, hosting numerous manufacturing processes in a partial 2?story, red brick, modified rectangular plan. Ceilings in production areas are open to the underside of roof structure with top of roofs ranging from 35 to 117 feet high. This Phase I will be a design build contract. Work will consist of, but not limited too, that following: Substructure (Patch and Level Existing Concrete Slab, Trench Repair); Shell (Exterior Brick Repair, Replacement of Exterior Doors and Door Hardware, Roofing Repairs); Interiors (Main Bay Area Excluding Offices/Labs) (Interior Window Refurbishment, Repair Interior Brick, Replacement of Signage, Painting Interior Walls/Partitions/Ceilings); Services (Compressed Air System Repairs and Upgrades, Domestic Water Repairs, Steam Distribution System Repairs, Standpipe Systems Repairs, Fire Suppression Systems Repairs, Electrical Repairs in Support of System Upgrades/Repairs); Special Construction and Demolition (Demolition to Support Repair Work, Abatement of Hazardous Materials to Support Repair Work, Sustainability Requirements in Support of Phase 1 Repairs) Acquisition Strategy This is a Design-Build (DB) firm-fixed- price contract resulting for a two-phase "Best Value Trade Off" Selection Procedure in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for the Repair Building 110, Big Gun Shop Phase I located at Watervliet Arsenal, NY. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The NAICS Code is 236220 (Commercial and Institutional Building Construction) Magnitude: $25M-$100M This project is a Unrestricted Full and Open Competition with Hubzone Price Preference PHASE ONE PROPOSAL ARE DUE BY 23 JULY 2025 AT 4 P.M. EASTERN DAYLIGHT TIME. NOTE: THIS ACQUISITION WILL INVOLVE A PROJECT LABOR AGREEMENT (PLA). PLEASE REFERENCE THE FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY FOR FURTHER INFORMATION ABOUT PLAS. FAR CLAUSE 52.222-33 ALTERNATE I IS USED (ONLY THE APPARENT SUCCESSFUL SUBMITS ITS PLA, PRIOR TO AWARD). THE SUBMISSION WILL BE REVIEWED FOR COMPLIANCE WITH ALL STATUTES, REGULATIONS, E.O.S, AND AGENCY REQUIREMENTS. AWARD SHALL NOT BE MADE UNTIL THE PLA IS FULLY COMPLIANT WITH THE CONTRACT REQUIREMENTS.
From Solicitation posted on Jul 16, 2025Background This project will be the Phase I Repairs to Building 110, Big Gun Shop. Building 110 is a 213,799 square foot industrial and manufacturing building, hosting numerous manufacturing processes in a partial 2?story, red brick, modified rectangular plan. Ceilings in production areas are open to the underside of roof structure with top of roofs ranging from 35 to 117 feet high. This Phase I will be a design build contract. Work will consist of, but not limited too, that following: Substructure (Patch and Level Existing Concrete Slab, Trench Repair); Shell (Exterior Brick Repair, Replacement of Exterior Doors and Door Hardware, Roofing Repairs); Interiors (Main Bay Area Excluding Offices/Labs) (Interior Window Refurbishment, Repair Interior Brick, Replacement of Signage, Painting Interior Walls/Partitions/Ceilings); Services (Compressed Air System Repairs and Upgrades, Domestic Water Repairs, Steam Distribution System Repairs, Standpipe Systems Repairs, Fire Suppression Systems Repairs, Electrical Repairs in Support of System Upgrades/Repairs); Special Construction and Demolition (Demolition to Support Repair Work, Abatement of Hazardous Materials to Support Repair Work, Sustainability Requirements in Support of Phase 1 Repairs) Acquisition Strategy This is a Design-Build (DB) firm-fixed- price contract resulting for a two-phase "Best Value Trade Off" Selection Procedure in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for the Repair Building 110, Big Gun Shop Phase I located at Watervliet Arsenal, NY. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The NAICS Code is 236220 (Commercial and Institutional Building Construction) Magnitude: $25M-$100M This project is a Unrestricted Full and Open Competition with Hubzone Price Preference PHASE ONE PROPOSAL ARE DUE BY 23 JULY 2025 AT 4 P.M. EASTERN DAYLIGHT TIME. NOTE: THIS ACQUISITION WILL INVOLVE A PROJECT LABOR AGREEMENT (PLA). PLEASE REFERENCE THE FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY FOR FURTHER INFORMATION ABOUT PLAS. FAR CLAUSE 52.222-33 ALTERNATE I IS USED (ONLY THE APPARENT SUCCESSFUL SUBMITS ITS PLA, PRIOR TO AWARD). THE SUBMISSION WILL BE REVIEWED FOR COMPLIANCE WITH ALL STATUTES, REGULATIONS, E.O.S, AND AGENCY REQUIREMENTS. AWARD SHALL NOT BE MADE UNTIL THE PLA IS FULLY COMPLIANT WITH THE CONTRACT REQUIREMENTS.
From Solicitation posted on Jul 22, 2025Notice history
3-
-
Solicitation Posted Jul 16, 2025No changes from previous notice
-
Solicitation LATEST Posted Jul 22, 2025No changes from previous notice