Building 1 HVAC Repair W50S8Q26QA001
Summary
AI-generated · Feb 03, 2026Repair the HVAC at Building 1, Blue Ash Air National Guard Base. Remove and dispose of the existing 30-ton rooftop unit (RTU) and install a new RTU, with curbing only if required to fit the new unit; remove the existing DDC controller and install a new one, plus install new controls on all HVAC components currently on the DDC. Provide and configure a new computer and workstation for the DDC, and remove the existing roof access ladder and hatch handrail to install a new one. This opportunity is full and open competition.
The intent of this project is to repair the HVAC at BLDG 1 Blue Ash Air National Guard Base. The following actions must be taken to meet this intent: remove and dispose of the existing 30-ton RTU. Provide and install a new RTU; install new curbing only if required to fit the new unit. Remove the existing DDC controller and install new. Install new controls onto all HVAC components that are currently on the DDC. Provide and configure a new computer and workstation for the DDC. Remove the existing roof access ladder and hatch handrail and install new. FULL AND OPEN COMPETITION.
From Solicitation posted on Feb 02, 2026PROJECT TITLE: Bldg 1 HVAC Repair PROJECT LOCATION: Blue Ash ANGB NAICS CODE: 238220 SIZE STANDARD: $19,000,000.00 FULL AND OPEN COMPETITION DISCLOSURE OF MAGNITUDE: IAW FAR 36.204(c) Is Between $100,00 and $250,000. EMAIL ALL PROPOSALS TO: kurt.becka@us.af.mil & seth.taylor.8@us.af.mil DAVIS BACON WAGE RATES ARE APPLICABLE TO THIS PROJECT. PREVAILING WAGE DERTERMINATION WILL BE INCUDED AT TIME OF AWARD. BID BOND REQUIRED. SEE SITE VISIT INFORMATION UNDER FAR 52.236-27 The intent of this project is to repair the HVAC at BLDG 1 Blue Ash Air National Guard Base. The following actions must be taken to meet this intent: remove and dispose of the existing 30-ton RTU. Provide and install a new RTU; install new curbing only if required to fit the new unit. Remove the existing DDC controller and install new. Install new controls onto all HVAC components that are currently on the DDC. Provide and configure a new computer and workstation for the DDC. Remove the existing roof access ladder and hatch handrail and install new.
From Solicitation posted on Feb 04, 2026PROJECT TITLE: Bldg 1 HVAC Repair PROJECT LOCATION: Blue Ash ANGB NAICS CODE: 238220 SIZE STANDARD: $19,000,000.00 FULL AND OPEN COMPETITION DISCLOSURE OF MAGNITUDE: IAW FAR 36.204(c) Is Between $100,00 and $250,000. EMAIL ALL PROPOSALS TO: kurt.becka@us.af.mil & seth.taylor.8@us.af.mil DAVIS BACON WAGE RATES ARE APPLICABLE TO THIS PROJECT. PREVAILING WAGE DERTERMINATION WILL BE INCUDED AT TIME OF AWARD. BID BOND REQUIRED. SEE SITE VISIT INFORMATION UNDER FAR 52.236-27 The intent of this project is to repair the HVAC at BLDG 1 Blue Ash Air National Guard Base. The following actions must be taken to meet this intent: remove and dispose of the existing 30-ton RTU. Provide and install a new RTU; install new curbing only if required to fit the new unit. Remove the existing DDC controller and install new. Install new controls onto all HVAC components that are currently on the DDC. Provide and configure a new computer and workstation for the DDC. Remove the existing roof access ladder and hatch handrail and install new.
From Solicitation posted on Feb 27, 2026PROJECT TITLE: Bldg 1 HVAC Repair PROJECT LOCATION: Blue Ash ANGB NAICS CODE: 238220 SIZE STANDARD: $19,000,000.00 FULL AND OPEN COMPETITION DISCLOSURE OF MAGNITUDE: IAW FAR 36.204(c) Is Between $100,00 and $250,000. EMAIL ALL PROPOSALS TO: kurt.becka@us.af.mil & seth.taylor.8@us.af.mil DAVIS BACON WAGE RATES ARE APPLICABLE TO THIS PROJECT. PREVAILING WAGE DERTERMINATION WILL BE INCUDED AT TIME OF AWARD. BID BOND REQUIRED. SEE SITE VISIT INFORMATION UNDER FAR 52.236-27 The intent of this project is to repair the HVAC at BLDG 1 Blue Ash Air National Guard Base. The following actions must be taken to meet this intent: remove and dispose of the existing 30-ton RTU. Provide and install a new RTU; install new curbing only if required to fit the new unit. Remove the existing DDC controller and install new. Install new controls onto all HVAC components that are currently on the DDC. Provide and configure a new computer and workstation for the DDC. Remove the existing roof access ladder and hatch handrail and install new.
From Solicitation posted on Mar 05, 2026Notice history
4-
-
Solicitation Posted Feb 27, 2026No changes from previous notice
-
Solicitation LATEST Posted Mar 05, 2026View changes (1)
- Response Deadline: Mar 06, 2026 → Mar 13, 2026
Details
Award Information
Not yet awarded