Buckley, SFB - Restripe Speed Humps and Crosswalks - 16 SEPT 2025 FA2543-Q0001
Summary
AI-generated · Sep 17, 2025Buckley Space Force Base needs a contractor to supply all labor, materials, equipment, transportation, and supervision to stripe, restripe, and install signage for crosswalks and speed humps shown in the attached exhibits. Work includes new striping for crosswalks that lack markings per Attachment A, restriping worn or partially effaced crosswalks, and placing crosswalk markings and stop bars in accordance with MUTCD. The contractor must prepare new pavement marking layouts for all required areas and obtain approval before beginning.
Signage work requires installing crosswalk signs per MUTCD at new crosswalks and at existing locations lacking appropriate signage; if suitable signage already exists, installation is not required. The contractor must field-verify all government-provided measurements to develop a firm-fixed-price proposal. Refer to the attached Statement of Work for full details.
Buckley Space Force Base located in Aurora, Colorado is in need of a contractor to provide all labor, materials, equipment, transportation, and supervision necessary to perform striping, restriping and signage of the crosswalks and speed humps shown in the attached exhibits. 1.0 Striping The Contractor shall provide new striping for all crosswalk locations that do not currently have striping per the figures in the included Attachment A in compliance with the requirements of the Manual on Uniform Traffic Control Devices (MUTCD). Existing crosswalks that are excessively worn or partially effaced will be stripped and restriped. The contractor shall place crosswalk markings and stop bars in accordance with (IAW) the MUTCD. The Contractor shall provide new pavement marking layouts, for all required areas, for approval prior to starting striping operations. 2.0 Signage The Contractor shall install crosswalk signage IAW the MUTCD at all new crosswalk locations as well as existing crosswalks that do not have the appropriate signage. If satisfactory signage exists at a location, the contractor does not need to provide or install signage for that location. The Contractor shall field verify all Government provided measurements at the area(s) of work to provide a firm fixed price proposal. Please see the attached Statement of Work dated 16 SEPT 2025 for all information. Please don't hesitate to reach out to me at jaisen.brown@spaceforce.mil if you have any questions or concerns relating to the project.
From Sources Sought posted on Sep 16, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA