Buckley SFB FA2543 Gas Valve Replacement BuckleySFBFA2543GasValveReplacement
Summary
AI-generated · Apr 03, 2026Replace six gas control valves at Buckley Space Force Base that are suspected to be damaged by a faulty gas regulator, with the contractor providing fully qualified technicians and all specialized tools necessary to complete the replacements. This is market research to determine procurement method, not a solicitation or commitment to award, and no quotes will be accepted at this time; two attachments contain additional information.
Respondents should address: fastest delivery time after award to Buckley SFB, whether a different NAICS code would fit the items, any certifications required by the end user to install the equipment, existence of a pre-priced contract vehicle and its schedule number, warranty coverage (including options), company name and contact details, authorization as an approved reseller on a GSA schedule, clarity of the requirement, rough order of magnitude, whether 60 days post-award is sufficient to complete the work, and whether a site visit would be needed.
This sources sought is issued for the purpose of market research in accordance with RFO Part 10. The result of this market research will contribute to determining the method of procurement. This announcement is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or to award a contract. At this time, BSFB is not seeking quotes and will not accept unsolicited quotes. Please see the two attachments that provides more information on this requirement. Primary Objective: The contractor shall provide fully qualified technicians and all specialized tools to replace six (6) gas control valves suspected of damage from a faulty gas regulator. Questions for discussion: (1) What is the fastest delivery time after award you could provide each of these items? (Please reply citing the delivery time to Buckley Space Force Base, Colorado.) (2) Is there a different NAICS code that would better fit the item(s)? (3) What certifications (if any) are required by the end user to use or install this brand of equipment? (4) Do you have a pre-priced contract vehicle with these items on your schedule? If so, please provide the contract/schedule number for validation. (5) Is a warranty included? If so, what is the standard commercial warranty? What are your extended warranty options? (6) Company name, address, point of contact, telephone number, e-mail address, CAGE/DUNS and pre-priced contract vehicle number if applicable. (7) Confirmation that you are an authorized re-seller of the items and provided on your GSA schedule (not open market). (8) Is this requirement clear? Do any aspects need further clarification? (9) Can you provide a Rough Order of Magnitude (ROM)? (10) Is 60 days after receipt of award enough time to complete the work and all deliverables? (11) Would a site visit be needed for this requirement?
From Sources Sought posted on Apr 02, 2026This sources sought is issued for the purpose of market research in accordance with RFO Part 10. The result of this market research will contribute to determining the method of procurement. This announcement is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or to award a contract. At this time, BSFB is not seeking quotes and will not accept unsolicited quotes. Please see the two attachments that provides more information on this requirement. Primary Objective: The contractor shall provide fully qualified technicians and all specialized tools to replace six (6) gas control valves suspected of damage from a faulty gas regulator. Questions for discussion: (1) What is the fastest delivery time after award you could provide each of these items? (Please reply citing the delivery time to Buckley Space Force Base, Colorado.) (2) Is there a different NAICS code that would better fit the item(s)? (3) What certifications (if any) are required by the end user to use or install this brand of equipment? (4) Do you have a pre-priced contract vehicle with these items on your schedule? If so, please provide the contract/schedule number for validation. (5) Is a warranty included? If so, what is the standard commercial warranty? What are your extended warranty options? (6) Company name, address, point of contact, telephone number, e-mail address, CAGE/DUNS and pre-priced contract vehicle number if applicable. (7) Confirmation that you are an authorized re-seller of the items and provided on your GSA schedule (not open market). (8) Is this requirement clear? Do any aspects need further clarification? (9) Can you provide a Rough Order of Magnitude (ROM)? (10) Is 60 days after receipt of award enough time to complete the work and all deliverables? (11) Would a site visit be needed for this requirement?
From Sources Sought posted on Apr 07, 2026This sources sought is issued for the purpose of market research in accordance with RFO Part 10. The result of this market research will contribute to determining the method of procurement. This announcement is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or to award a contract. At this time, BSFB is not seeking quotes and will not accept unsolicited quotes. Please see the two attachments that provides more information on this requirement. Primary Objective: The contractor shall provide fully qualified technicians and all specialized tools to replace six (6) gas control valves suspected of damage from a faulty gas regulator. Questions for discussion: (1) What is the fastest delivery time after award you could provide each of these items? (Please reply citing the delivery time to Buckley Space Force Base, Colorado.) (2) Is there a different NAICS code that would better fit the item(s)? (3) What certifications (if any) are required by the end user to use or install this brand of equipment? (4) Do you have a pre-priced contract vehicle with these items on your schedule? If so, please provide the contract/schedule number for validation. (5) Is a warranty included? If so, what is the standard commercial warranty? What are your extended warranty options? (6) Company name, address, point of contact, telephone number, e-mail address, CAGE/DUNS and pre-priced contract vehicle number if applicable. (7) Confirmation that you are an authorized re-seller of the items and provided on your GSA schedule (not open market). (8) Is this requirement clear? Do any aspects need further clarification? (9) Can you provide a Rough Order of Magnitude (ROM)? (10) Is 60 days after receipt of award enough time to complete the work and all deliverables? (11) Would a site visit be needed for this requirement?
From Sources Sought posted on Apr 10, 2026This sources sought is issued for the purpose of market research in accordance with RFO Part 10. The result of this market research will contribute to determining the method of procurement. This announcement is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or to award a contract. At this time, BSFB is not seeking quotes and will not accept unsolicited quotes. Please see the two attachments that provides more information on this requirement. Primary Objective: The contractor shall provide fully qualified technicians and all specialized tools to replace six (6) gas control valves suspected of damage from a faulty gas regulator. Questions for discussion: (1) What is the fastest delivery time after award you could provide each of these items? (Please reply citing the delivery time to Buckley Space Force Base, Colorado.) (2) Is there a different NAICS code that would better fit the item(s)? (3) What certifications (if any) are required by the end user to use or install this brand of equipment? (4) Do you have a pre-priced contract vehicle with these items on your schedule? If so, please provide the contract/schedule number for validation. (5) Is a warranty included? If so, what is the standard commercial warranty? What are your extended warranty options? (6) Company name, address, point of contact, telephone number, e-mail address, CAGE/DUNS and pre-priced contract vehicle number if applicable. (7) Confirmation that you are an authorized re-seller of the items and provided on your GSA schedule (not open market). (8) Is this requirement clear? Do any aspects need further clarification? (9) Can you provide a Rough Order of Magnitude (ROM)? (10) Is 60 days after receipt of award enough time to complete the work and all deliverables? (11) Would a site visit be needed for this requirement?
From Sources Sought posted on Apr 15, 2026Notice history
4-
-
Sources Sought LATEST Posted Apr 15, 2026View changes (1)
- Response Deadline: Apr 15, 2026 → Apr 17, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA