Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 3 notices

BSU-33 C/B Conical Fin Assembly W519TC-26-R-BSU33-Fins

Solicitation W519TC-26-R-BSU33-Fins Copied Notice ID b7942852a2084236971fb1c262111b85 Copied DEPT OF DEFENSE — W6QK ACC-RI
SAM.gov
Posted
Jan 20, 2026
Deadline
Mar 02, 2026
Set-aside
None
NAICS
N/A
PSC
N/A

Summary

AI-generated · Jan 16, 2026

Produce and deliver the BSU-33 C/B Conical Fin Assembly (for FY 2028–2032) under a potential Firm Fixed Price production contract with five one-year ordering periods, targeting about 3,000–5,000 units per year. The fin assembly attaches to the 500 lb MK 82/BLU-111 bomb and is fabricated from steel alloys, with specified dimensions and weight. Required manufacturing capabilities include welding (AWS D17.1 Class A/B and AWS D17.2 resistance), heat treating, machining, coatings, and metal forming, plus fabrication of the ADU-426/E Pallet Adapter. The contractor may also receive Government Furnished Material (MK3 MOD 0 Pallet) and must meet multiple inspection checkpoints (First Article, Preproduction, and Lot Acceptance) using special test equipment to ensure compliance with a Government Technical Data Package (TDP).

Access to the TDPs is restricted (Distribution D) and export-controlled; vendors must be registered in the Joint Certification Program (JCP) and have a SAM account, with the Data Custodian listed on DD Form 2345 authorized to receive the controlled drawings. Interested firms should respond with their capabilities, facility and staff qualifications, quality system, and relevant experience; provide lead times (270 days for First Article testing and 365 days after award to begin production), rough order of magnitude pricing for the FY28 quantity and for FAT samples, and production capacity (minimum/maximum monthly output). Indicate whether you have previously produced the BSU-33 C/B Fin Assembly, identify market risks or material price volatility, and specify whether you seek to bid as a prime or subcontractor. This is a sources-sought notice for planning only, not a formal RFP, and responses are non-binding.

The U.S. Army Contracting Command - Rock Island, on behalf of the Project Manager Close Combat Systems (PM CCS), is issuing a sources sought announcement in an effort to identify capable sources for the production and delivery of the following: BSU-33 C/B Conical Fin Assembly (NSN 1325-01-614-4020; P/N: 923AS900) for Fiscal Years (FYs) 2028-2032 requirements. The U.S. Government is considering one Firm Fixed Price (FFP) production contract with five one-year ordering periods and a yearly production quantity of approximately of 3,000-5,000 each per year. ITEM DESCRIPTION: This requirement supports the United States Air Force and the United States Navy bombing missions. The BSU-33 C/B Fin Assembly attaches to the 500 lb. MK 82/BLU-111 General Purpose Bomb. The Fin is approximately 26.11 inches long, a fins span of 15.06 inches and weighs approximately 22.1 lbs. The BSU-33 C/B and subassemblies are fabricated from steel alloys, cut, formed, machined assembled, and welded to drawing requirements. CRITICAL PROCESSES/SKILLS: Specialized skills required include welding (to include but not limited to, AWS D17.1 Class A and B welds, and AWS D17.2 resistance welds), heat treating, machining, coatings, and metal forming. The contractor will be responsible for manufacturing the ADU-426/E Pallet Adapter, NSN: 8140-01-126-5387, P/N:1107AS100. For different stages of the manufacturing process, special inspection and test equipment is required to ensure that the final products comply with Government requirements. The Contractor will be required to successfully complete First Article Acceptance, Preproduction, and Lot Acceptance tests on the Fin assemblies. The BSU-33 C/B Fin is procured to an U.S Government Technical Data Package (TDP). The Government anticipates providing the MK3 MOD 0 Pallet, NSN:3990-00-039-0223, P/N: 564200, as Government Furnished Material for this planned contract. NOTICE: The TDPs associated with the BSU-33 C/B Conical Fin Assembly are classified as Distribution D - limited distribution authorized to the Department of Defense (DOD) and US DOD Contractors Only. These documents contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., SEC 2751, ET SEQ.) or the Export Administration Act of 1979 (Title 50, U.S.C., APP 2401 ET SEQ.), as Amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25. Interested vendors must be registered with the U.S./Canada Joint Certification Program (JCP) to gain access to the TDPs (see https://www.dla.mil/logistics-operations/services/jcp/ for instruction and information). Each individual requiring access to the TDPs must have a SAM.gov account prior to accessing the TDPs. Access to the TDP will only be granted to those individuals who are listed as the Data Custodian (block 3) on the DD Form 2345, Military Critical Technical Data Requirement, which was required to be registered within the JCP. The Data Custodian is the sole representative identified to receive export controlled TDPs and drawings. To obtain the top-level drawings, interested vendors with the proper certification in JCP, may request explicit access through the "attachments/links" tab in SAM.gov under this posting. In addition to making the request by the JCP Data Custodian in SAM.gov, interested vendors should also send a copy of their approved DD Form 2345 to the point of contact specified below. RESPONSES: Interested companies who consider themselves capable of manufacturing the practice bombs and the associated suspension lugs are invited to indicate interest by providing the U.S. Government with the following information: Name of company and CAGE code Point of Contacts name, telephone number and E-mail address Company address Business size information Identification of whether you are interested in this opportunity as a prime or a subcontractor. Provide a summary of the company's capabilities (a description of the facilities, personnel experience, quality system, and past/current relevant manufacturing experience and processes). Discuss the feasibility of or alternatives to the U.S. Government's preferred lead-time of 270 days after award for First Article Test (FAT) and 365 days after award for production deliveries to commence. Provide Rough Order of Magnitude (ROM) prices for an approximate FY28 production quantity of 3,000-5,000 BSU-33 C/B Conical Fins, and a ROM for each First Article Test sample. Identify minimum and maximum monthly production quantities and identify the available capacity. Identify if the firm has ever produced the BSU-33 C/B Conical Fin Assembly. If so, please state when it was last produced, who the customer was, the production rate under that contract, and the contract number. Please include any assumptions made, recommendations regarding price range breaks, or any additional information you feel might be useful to the U.S. Government if it is determined to proceed with a formal Request for Proposal (RFP). Due to current global supply chain and other factors, respondents are asked to identify any components or materials that may be subject to price volatility or scarcity and address what their firm is doing to mitigate risk related to obtaining materials, price impacts, and production stability. This sources sought announcement is for information and planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the U.S. Government. The U.S. Government does not intend to award a contract based on this sources sought announcement or otherwise pay for information solicited. Industry responses to this sources sought will not represent binding offers, and the U.S. Government cannot accept an industry response to form a binding contract. The U.S. Government intends to use any information submitted in response to this request to develop an acquisition strategy for future requirements of this item. To be eligible for contracts with the U.S. Government, contractors must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from a planned solicitation for these items. Contractors may obtain information on SAM registration by visiting https://www.acquisition.gov. All interested companies are highly encouraged to get registered in SAM immediately. The U.S. Government will hold all information submitted in a confidential status. For additional information regarding this announcement, please contact the Contract Specialist via email at laura.k.spencer2.civ@army.mil and Contracting Officer, Shawn Kerr, via email at shawn.e.kerr6civ@army.mil. Industry responses are requested electronically no later than 12:00PM CT, 02 March 2026 to be considered in the development of the acquisition strategy for these items. Please submit all industry responses to Ms. Laura Spencer at laura.k.spencer2.civ@army.mil and Contracting Officer, Shawn Kerr, via email at shawn.e.kerr6.civ@army.mil. All responses to this sources sought announcement should reference in the subject: Sources Sought Response for BSU-33 C/B Conical Fin Assembly.

From Sources Sought posted on Jan 15, 2026

The U.S. Army Contracting Command - Rock Island, on behalf of the Project Manager Close Combat Systems (PM CCS), is issuing a sources sought announcement in an effort to identify capable sources for the production and delivery of the following: BSU-33 C/B Conical Fin Assembly (NSN 1325-01-614-4020; P/N: 923AS900) for Fiscal Years (FYs) 2028-2032 requirements. The U.S. Government is considering one Firm Fixed Price (FFP) production contract with five one-year ordering periods and a yearly production quantity of approximately of 3,000-5,000 each per year. ITEM DESCRIPTION: This requirement supports the United States Air Force and the United States Navy bombing missions. The BSU-33 C/B Fin Assembly attaches to the 500 lb. MK 82/BLU-111 General Purpose Bomb. The Fin is approximately 26.11 inches long, a fins span of 15.06 inches and weighs approximately 22.1 lbs. The BSU-33 C/B and subassemblies are fabricated from steel alloys, cut, formed, machined assembled, and welded to drawing requirements. CRITICAL PROCESSES/SKILLS: Specialized skills required include welding (to include but not limited to, AWS D17.1 Class A and B welds, and AWS D17.2 resistance welds), heat treating, machining, coatings, and metal forming. The contractor will be responsible for manufacturing the ADU-426/E Pallet Adapter, NSN: 8140-01-126-5387, P/N:1107AS100. For different stages of the manufacturing process, special inspection and test equipment is required to ensure that the final products comply with Government requirements. The Contractor will be required to successfully complete First Article Acceptance, Preproduction, and Lot Acceptance tests on the Fin assemblies. The BSU-33 C/B Fin is procured to an U.S Government Technical Data Package (TDP). The Government anticipates providing the MK3 MOD 0 Pallet, NSN:3990-00-039-0223, P/N: 564200, as Government Furnished Material for this planned contract. NOTICE: The TDPs associated with the BSU-33 C/B Conical Fin Assembly are classified as Distribution D - limited distribution authorized to the Department of Defense (DOD) and US DOD Contractors Only. These documents contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., SEC 2751, ET SEQ.) or the Export Administration Act of 1979 (Title 50, U.S.C., APP 2401 ET SEQ.), as Amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25. Interested vendors must be registered with the U.S./Canada Joint Certification Program (JCP) to gain access to the TDPs (see https://www.dla.mil/logistics-operations/services/jcp/ for instruction and information). Each individual requiring access to the TDPs must have a SAM.gov account prior to accessing the TDPs. Access to the TDP will only be granted to those individuals who are listed as the Data Custodian (block 3) on the DD Form 2345, Military Critical Technical Data Requirement, which was required to be registered within the JCP. The Data Custodian is the sole representative identified to receive export controlled TDPs and drawings. To obtain the top-level drawings, interested vendors with the proper certification in JCP, may request explicit access through the "attachments/links" tab in SAM.gov under this posting. In addition to making the request by the JCP Data Custodian in SAM.gov, interested vendors should also send a copy of their approved DD Form 2345 to the point of contact specified below. RESPONSES: Interested companies who consider themselves capable of manufacturing the practice bombs and the associated suspension lugs are invited to indicate interest by providing the U.S. Government with the following information: Name of company and CAGE code Point of Contacts name, telephone number and E-mail address Company address Business size information Identification of whether you are interested in this opportunity as a prime or a subcontractor. Provide a summary of the company's capabilities (a description of the facilities, personnel experience, quality system, and past/current relevant manufacturing experience and processes). Discuss the feasibility of or alternatives to the U.S. Government's preferred lead-time of 270 days after award for First Article Test (FAT) and 365 days after award for production deliveries to commence. Provide Rough Order of Magnitude (ROM) prices for an approximate FY28 production quantity of 3,000-5,000 BSU-33 C/B Conical Fins, and a ROM for each First Article Test sample. Identify minimum and maximum monthly production quantities and identify the available capacity. Identify if the firm has ever produced the BSU-33 C/B Conical Fin Assembly. If so, please state when it was last produced, who the customer was, the production rate under that contract, and the contract number. Please include any assumptions made, recommendations regarding price range breaks, or any additional information you feel might be useful to the U.S. Government if it is determined to proceed with a formal Request for Proposal (RFP). Due to current global supply chain and other factors, respondents are asked to identify any components or materials that may be subject to price volatility or scarcity and address what their firm is doing to mitigate risk related to obtaining materials, price impacts, and production stability. This sources sought announcement is for information and planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the U.S. Government. The U.S. Government does not intend to award a contract based on this sources sought announcement or otherwise pay for information solicited. Industry responses to this sources sought will not represent binding offers, and the U.S. Government cannot accept an industry response to form a binding contract. The U.S. Government intends to use any information submitted in response to this request to develop an acquisition strategy for future requirements of this item. To be eligible for contracts with the U.S. Government, contractors must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from a planned solicitation for these items. Contractors may obtain information on SAM registration by visiting https://www.acquisition.gov. All interested companies are highly encouraged to get registered in SAM immediately. The U.S. Government will hold all information submitted in a confidential status. For additional information regarding this announcement, please contact the Contract Specialist via email at laura.k.spencer2.civ@army.mil and Contracting Officer, Shawn Kerr, via email at shawn.e.kerr6civ@army.mil. Industry responses are requested electronically no later than 12:00PM CT, 02 March 2026 to be considered in the development of the acquisition strategy for these items. Please submit all industry responses to Ms. Laura Spencer at laura.k.spencer2.civ@army.mil and Contracting Officer, Shawn Kerr, via email at shawn.e.kerr6.civ@army.mil. All responses to this sources sought announcement should reference in the subject: Sources Sought Response for BSU-33 C/B Conical Fin Assembly.

From Sources Sought posted on Jan 16, 2026

The purpose of this amendment 01 is to update paragraph six titled RESPONSES. The U.S. Army Contracting Command - Rock Island, on behalf of the Project Manager Close Combat Systems (PM CCS), is issuing a sources sought announcement in an effort to identify capable sources for the production and delivery of the following: BSU-33 C/B Conical Fin Assembly (NSN 1325-01-614-4020; P/N: 923AS900) for Fiscal Years (FYs) 2028-2032 requirements. The U.S. Government is considering one Firm Fixed Price (FFP) production contract with five one-year ordering periods and a yearly production quantity of approximately of 3,000-5,000 each per year. ITEM DESCRIPTION: This requirement supports the United States Air Force and the United States Navy bombing missions. The BSU-33 C/B Fin Assembly attaches to the 500 lb. MK 82/BLU-111 General Purpose Bomb. The Fin is approximately 26.11 inches long, a fins span of 15.06 inches and weighs approximately 22.1 lbs. The BSU-33 C/B and subassemblies are fabricated from steel alloys, cut, formed, machined assembled, and welded to drawing requirements. CRITICAL PROCESSES/SKILLS: Specialized skills required include welding (to include but not limited to, AWS D17.1 Class A and B welds, and AWS D17.2 resistance welds), heat treating, machining, coatings, and metal forming. The contractor will be responsible for manufacturing the ADU-426/E Pallet Adapter, NSN: 8140-01-126-5387, P/N:1107AS100. For different stages of the manufacturing process, special inspection and test equipment is required to ensure that the final products comply with Government requirements. The Contractor will be required to successfully complete First Article Acceptance, Preproduction, and Lot Acceptance tests on the Fin assemblies. The BSU-33 C/B Fin is procured to an U.S Government Technical Data Package (TDP). The Government anticipates providing the MK3 MOD 0 Pallet, NSN:3990-00-039-0223, P/N: 564200, as Government Furnished Material for this planned contract. NOTICE: The TDPs associated with the BSU-33 C/B Conical Fin Assembly are classified as Distribution D - limited distribution authorized to the Department of Defense (DOD) and US DOD Contractors Only. These documents contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., SEC 2751, ET SEQ.) or the Export Administration Act of 1979 (Title 50, U.S.C., APP 2401 ET SEQ.), as Amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25. Interested vendors must be registered with the U.S./Canada Joint Certification Program (JCP) to gain access to the TDPs (see https://www.dla.mil/logistics-operations/services/jcp/ for instruction and information). Each individual requiring access to the TDPs must have a SAM.gov account prior to accessing the TDPs. Access to the TDP will only be granted to those individuals who are listed as the Data Custodian (block 3) on the DD Form 2345, Military Critical Technical Data Requirement, which was required to be registered within the JCP. The Data Custodian is the sole representative identified to receive export controlled TDPs and drawings. To obtain the top-level drawings, interested vendors with the proper certification in JCP, may request explicit access through the "attachments/links" tab in SAM.gov under this posting. In addition to making the request by the JCP Data Custodian in SAM.gov, interested vendors should also send a copy of their approved DD Form 2345 to the point of contact specified below. RESPONSES: Interested companies who consider themselves capable of manufacturing the BSU-33 C/B Conical Fin Assembly are invited to indicate interest by providing the U.S. Government with the following information: Name of company and CAGE code Point of Contacts name, telephone number and E-mail address Company address Business size information Identification of whether you are interested in this opportunity as a prime or a subcontractor. Provide a summary of the company's capabilities (a description of the facilities, personnel experience, quality system, and past/current relevant manufacturing experience and processes). Discuss the feasibility of or alternatives to the U.S. Government's preferred lead-time of 270 days after award for First Article Test (FAT) and 365 days after award for production deliveries to commence. Provide Rough Order of Magnitude (ROM) prices for an approximate FY28 production quantity of 3,000-5,000 BSU-33 C/B Conical Fins, and a ROM for each First Article Test sample. Identify minimum and maximum monthly production quantities and identify the available capacity. Identify if the firm has ever produced the BSU-33 C/B Conical Fin Assembly. If so, please state when it was last produced, who the customer was, the production rate under that contract, and the contract number. Please include any assumptions made, recommendations regarding price range breaks, or any additional information you feel might be useful to the U.S. Government if it is determined to proceed with a formal Request for Proposal (RFP). Due to current global supply chain and other factors, respondents are asked to identify any components or materials that may be subject to price volatility or scarcity and address what their firm is doing to mitigate risk related to obtaining materials, price impacts, and production stability. This sources sought announcement is for information and planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the U.S. Government. The U.S. Government does not intend to award a contract based on this sources sought announcement or otherwise pay for information solicited. Industry responses to this sources sought will not represent binding offers, and the U.S. Government cannot accept an industry response to form a binding contract. The U.S. Government intends to use any information submitted in response to this request to develop an acquisition strategy for future requirements of this item. To be eligible for contracts with the U.S. Government, contractors must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from a planned solicitation for these items. Contractors may obtain information on SAM registration by visiting https://www.acquisition.gov. All interested companies are highly encouraged to get registered in SAM immediately. The U.S. Government will hold all information submitted in a confidential status. For additional information regarding this announcement, please contact the Contract Specialist via email at laura.k.spencer2.civ@army.mil and Contracting Officer, Shawn Kerr, via email at shawn.e.kerr6civ@army.mil. Industry responses are requested electronically no later than 12:00PM CT, 02 March 2026 to be considered in the development of the acquisition strategy for these items. Please submit all industry responses to Ms. Laura Spencer at laura.k.spencer2.civ@army.mil and Contracting Officer, Shawn Kerr, via email at shawn.e.kerr6.civ@army.mil. All responses to this sources sought announcement should reference in the subject: Sources Sought Response for BSU-33 C/B Conical Fin Assembly.

From Sources Sought posted on Jan 20, 2026

Notice history

3
  1. Sources Sought Posted Jan 15, 2026 View
  2. Sources Sought Posted Jan 16, 2026
    No changes from previous notice
  3. Sources Sought LATEST Posted Jan 20, 2026
    • Description: Description was updated

Details

Solicitation number W519TC-26-R-BSU33-Fins
Notice ID b7942852a2084236971fb1c262111b85
Notice type Sources Sought
Archive date Mar 17, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Laura Spencer

Email

Phone

secondary
Shawn Kerr

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
ACC-CTRS
ACC RI
W6QK ACC-RI

Dates

Posted Jan 20, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 02, 2026 5 months ago