Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 5 documents

Brush Creek/Hayden Ranger District, Office Roof Replacement 1282B125R0031

Solicitation 1282B125R0031 Copied Notice ID 2aa9d1d7a30b44aaa8b042820e5d0058 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 8
SAM.gov
Posted
Jul 29, 2025
Deadline
Aug 27, 2025
Set-aside
SBA
NAICS
238160
PSC
Z1JZ

Summary

AI-generated · Aug 24, 2025

Re-roofing the Brush Creek/Hayden Office located at the Saratoga District Office Administrative Site on the Brush Creek/Hayden Ranger District in Saratoga, WY. The scope includes complete demolition of existing roof coverings and underlayment and full replacement with new underlayment and a 24-gauge (minimum) Structural Standing Seam Roof System (SSSRS). Also required are removal and disposal of all waste materials and daily site cleanup. Work must comply with industry standards, local building codes, and manufacturer installation recommendations. Refer to the Statement of Work and Specifications for additional information and proposal submission requirements.

Note: The site visit originally scheduled has been cancelled; a new Solicitation will be posted in the coming week(s) to provide updated dates for the site visit, questions, and proposal due dates. The overall scope remains as described above, with updated dates to be announced.

Work for this project consists of re-roofing the Brush Creek/Hayden Office located at the Saratoga District Office Administrative Site on the Brush Creek/Hayden Ranger District in Saratoga, WY. This work includes the complete demolition of existing roof coverings and underlayment and full replacement with new underlayment and a new 24-gauge (minimum) Structural Standing Seam Roof System (SSSRS). This work shall also include removing and disposing of all waste materials associated with this work, and cleanup of the site throughout each workday. All work shall adhere to industry standards, local building code requirements, and manufacturer installation recommendations. See the SOW and SPECS for additional information as well as Solicitation for proposal submission requirements.

From Solicitation posted on Jul 29, 2025

NOTE: The Site Visit on August 5th, 2025 at 10:00 am MT has been CANCELLED. A new Solicitation will be posted within the coming week(s) to provide new dates for the Site Visit, Questions, and Proposal Due dates. Work for this project consists of re-roofing the Brush Creek/Hayden Office located at the Saratoga District Office Administrative Site on the Brush Creek/Hayden Ranger District in Saratoga, WY. This work includes the complete demolition of existing roof coverings and underlayment and full replacement with new underlayment and a new 24-gauge (minimum) Structural Standing Seam Roof System (SSSRS). This work shall also include removing and disposing of all waste materials associated with this work, and cleanup of the site throughout each workday. All work shall adhere to industry standards, local building code requirements, and manufacturer installation recommendations. See the SOW and SPECS for additional information as well as Solicitation for proposal submission requirements.

From Solicitation posted on Aug 01, 2025

Notice history

2
  1. Solicitation Posted Jul 29, 2025
  2. Solicitation LATEST Posted Aug 01, 2025
    • Description: Description was updated

Details

Solicitation number 1282B125R0031
Notice ID 2aa9d1d7a30b44aaa8b042820e5d0058
Notice type Solicitation
Product / Service (PSC) Z1JZ
NAICS 238160
Place of performance Saratoga, Wyoming
Archive date Sep 27, 2025

Award Information

Not yet awarded

Contacts

primary
Janice King

Email

secondary
Lucas Dahlman

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 8

Place of Performance

Saratoga, Wyoming 82331
USA

Dates

Posted Jul 29, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 27, 2025 11 months ago