Brandon Road Interbasin Project Industry Day - 7 April 2026 W912EK26BRIPID
Summary
AI-generated · Mar 28, 2026Industry Day will provide an overview of the Brandon Road Interbasin Project, focusing on the Increment II Flushing Lock and Right Descending Bank Construction Contract, and explain how the deterrent systems (electric, hydroacoustic, and bubble) will be used in the lock chamber and approach channel to deter invasive species while allowing river navigation. The project is organized into three construction increments, and attendees will learn about project background, phasing, and design details, with a question-and-answer session.
Participants can offer feedback to help improve the design for efficiency and cost-effectiveness and network with potential prime contractors, subcontractors, and suppliers. Draft plan sets for the Flushing Lock and Right Descending Bank Wall are attached for review. Registration is available via the provided link, and the event will be held at the Davenport River Center.
The U.S. Army Corps of Engineers, Rock Island District invites you to an Industry Day on Tuesday 7 April 2026 from 8:30am 12:00pm for the Brandon Road Interbasin Project. Agenda 8:30 - 9:00 a.m. Check-In 9:30 - 11:30 a.m. Presentation and Question and Answer Session Location: Davenport River Center - Arkansas Room 136 E 3rd St Davenport, Iowa 52801 **Please see the following link for registration for the Brandon Road Interbasin Project Industry Day.** https://forms.osi.apps.mil/r/EGBRszaBQX This is your opportunity to learn about this significant infrastructure project and how your company can be a part of it. Project Overview: The Brandon Road Interbasin Project is a critical control point in preventing Invasive Species, including Invasive Carp fish, from becoming established in the Great Lakes. This project will construct a series of deterrent measures in the lock chamber and approach channel. Once complete, a series of electric, hydroacoustic, and bubble deterrents will be operational while facilitating river navigation traffic. The project is broken into 3 construction increments (shown below). This presentation will focus on Increment II Flushing Lock and Right Descending Bank Construction Contract. The purpose of this engagement is to provide contractors awareness of the upcoming contract and also to solicit feedback during this presentation regarding ways to improve the design to allow for more efficient and cost-effective construction. The project is designed in 3 construction increments, as follows: Increment I - Leading Edge Automated Barge Clearing (ABC) Deterrent Bubble Curtain Deterrent Acoustic Deterrent (Leading Edge) Leading Edge Support Facilities Upstream Boat Ramp Channel Rock Excavation Increment II Flushing Lock and Right Descending Bank Flushing Lock (FL) Right Descending Bank (RDB) Wall Channel Rock Excavation Increment III - Engineered Channel Electric Deterrent Acoustic Deterrent (Eng Channel) Support Facilities Building Engineered Channel Floor & Walls Downstream Boat Ramp Industry Day Highlights: Attend the presentation with detailed information about the project scope, timeline, and specific requirements for each phase. Get your questions answered by USACE representatives and project engineers during Q&A. Provide feedback on how to improve design to allow for more efficient and cost-effective construction. Network with potential prime contractors, subcontractors, and suppliers to explore partnerships and innovative solutions. Presentation will include: Project Background Construction Phasing and Sequencing Status of Increment II Design Details of Increment II Design Industry Questions **Draft Plan Sets for the Flushing Lock and RDB Wall are attached below in the Attachments/Links section**
From Special Notice posted on Mar 27, 2026Notice history
1-
Special Notice LATEST Posted Mar 27, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA