BOWLING CENTER AND F&B UPGRADES NAVMWR-26-R-0038
Summary
AI-generated · Jun 17, 2026Renovate and modernize the eight-lane Bowling Center (Building 485) by replacing the existing pinsetter with a new unit, and include a string bowling configuration, an electronic gaming area, and a food operation, with all demolition, installation, renovation, temporary construction, and restoration needed to deliver a complete, usable facility.
Provide all site investigations and surveys, including utility locates and subsurface potholing, coordinated with the Installation COR; deliver complete architectural, civil, structural, mechanical, electrical, landscape, and fire protection designs to meet applicable codes and requirements (refer to Section H for design submittal details); supply all materials, furnishings, equipment, and fixtures, and manage material handling, staging, delivery/receiving, loading/unloading, and any required lifting equipment throughout all phases of work; more information is in the attached RFP.
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility pot holing ) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP.
From Solicitation posted on Jun 16, 2026The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility pot holing ) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP.
From Solicitation posted on Jun 23, 2026Notice history
2-
-
Solicitation LATEST Posted Jun 23, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA