Boiler Blowdown Drainpipe Repair, Corpus Christi 12639526P0069
Summary
AI-generated · Feb 27, 2026Repair and replacement of the boiler blowdown drainpipe beneath the concrete floor in the facility’s mechanical room. The existing drain line has failed and no longer provides reliable drainage for boiler blowdown operations. The work will restore safe, code-compliant drainage and prevent further water intrusion or structural damage, per the attached statement of work.
The contract was awarded to Parliament LLC for $16,734.
The USDA Corpus Christi Cotton Classing Office requires repair and replacement of the boiler blowdown drainpipe located beneath the concrete floor of the facility s mechanical room. The existing drain line has failed and no longer provides reliable drainage for boiler blowdown operations. This project will restore safe, code?compliant drainage and prevent further water intrusion or structural damage. See attached statement of work.
From Award Notice posted on Feb 26, 2026Notice history
1Details
Award Information
Award Notices
Posted: Feb 26, 2026
The USDA Corpus Christi Cotton Classing Office requires repair and replacement of the boiler blowdown drainpipe located beneath the concrete floor of the facility s mechanical room. The existing drain line has failed and no longer provides reliable drainage for boiler blowdown operations. This proje...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| PARLIAMENT LLC | DMEAS1ZSTVY8 | 6XL51 | Beachwood, OH |
Contacts
Phone
Agency
Place of Performance
USA