F--BLM-CO GJFO 18RD EVENT AREA GRADING 140L1725Q0036
Summary
AI-generated · Aug 24, 2025Grading and site improvements are needed at the BLM 18rd Event Area in Mesa County, CO, including site grading, drainage upgrades, parking lot leveling, and gravel pours to prepare the event area and lower campground. The work is located about 10 miles north of Fruita along 18 Road, and a firm fixed-price contract will be used with a Total Small Business Set-Aside. Work must be completed within 425 days of Notice to Proceed, Monday through Friday, with work paused if snow or snowmelt prevents access; federal holidays are not allowed work days. A pre-bid site visit is not scheduled, but bidders may visit the site on their own or wait for a scheduled tour. Submittals require an SF18 with amendments acknowledged, a technical response per Sections L and M, and pricing by the solicitation close date, with basic contracting requirements including active SAM registration, Davis-Bacon wage compliance, and potential bonding.
An amendment cancels this solicitation and directs consideration to IDR 140L1723D0001. The project description and site details are otherwise the same as stated above, including the 425-day performance window, site location, and bid submission requirements.
BLM-CO GJFO 18RD EVENT AREA GRADING This is a solicitation announcement for an event area grading project located at the Bureau of Land Management 18rd Event Area Grading in Mesa County, Colorado. 18rd Event Area is approximately 10 miles North of Fruita, CO off of Highway 70. Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION The work includes, but is not limited to; site grading, drainage improvement, parking lot leveling, and pouring gravel. 1.2 LOCATION Take Interstate 70 west to Fruita (exit 19). Turn north onto Cherry Street and take the first right onto Aspen Avenue. Go through the roundabout and continue on Aspen to Maple Street. Take a left on Maple Street and then travel north. The street will turn into 17.5 Road. Take a right on N.3 Road and then a left on 18 Road. Travel approximately 7 miles on 18 Road to the trailhead, event area and lower campground. Continue 1.5 miles north to reach the upper campground loops. Coordinates: 39.334, -108.704 For more information related to camping at the North Fruita Desert Campground, visit https://www.blm.gov/visit/nfd-campground 1.3 WORK SCHEDULE Work shall be completed within 425 days of the Notice to Proceed. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 425 days of the Notice to Proceed. Rough Order of Magnitude - Less than $25,000 Pre-Bid Site Visit: A hosted site visit has not yet been scheduled. If interested and convenient, you are welcome to visit this public site on your own. Or you can wait until the scheduled pre-bid tour. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local APEX- https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 13 - Simplified Acquisitions 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Mesa County, CO 6. Total Small Business Set-Aside for NAICS 238910 (Site Preparation Contractors)- Size Std: $19M 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -Price and other Factors Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF18 with acknowledgement of all amendments. 2. Technical Response per Section L and M. 3. Email items 1-2 above to the POC no later than the solicitation close date. Primary POC: Contracting Specialist Courtni Strickland c1strickland@blm.gov
From Solicitation posted on Aug 12, 2025BLM-CO GJFO 18RD EVENT AREA GRADING This amendment is to cancel the solicitation to utilized IDR 140L1723D0001. This is a solicitation announcement for an event area grading project located at the Bureau of Land Management 18rd Event Area Grading in Mesa County, Colorado. 18rd Event Area is approximately 10 miles North of Fruita, CO off of Highway 70. Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION The work includes, but is not limited to; site grading, drainage improvement, parking lot leveling, and pouring gravel. 1.2 LOCATION Take Interstate 70 west to Fruita (exit 19). Turn north onto Cherry Street and take the first right onto Aspen Avenue. Go through the roundabout and continue on Aspen to Maple Street. Take a left on Maple Street and then travel north. The street will turn into 17.5 Road. Take a right on N.3 Road and then a left on 18 Road. Travel approximately 7 miles on 18 Road to the trailhead, event area and lower campground. Continue 1.5 miles north to reach the upper campground loops. Coordinates: 39.334, -108.704 For more information related to camping at the North Fruita Desert Campground, visit https://www.blm.gov/visit/nfd-campground 1.3 WORK SCHEDULE Work shall be completed within 425 days of the Notice to Proceed. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 425 days of the Notice to Proceed. Rough Order of Magnitude - Less than $25,000 Pre-Bid Site Visit: A hosted site visit has not yet been scheduled. If interested and convenient, you are welcome to visit this public site on your own. Or you can wait until the scheduled pre-bid tour. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local APEX- https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 13 - Simplified Acquisitions 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Mesa County, CO 6. Total Small Business Set-Aside for NAICS 238910 (Site Preparation Contractors)- Size Std: $19M 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -Price and other Factors Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF18 with acknowledgement of all amendments. 2. Technical Response per Section L and M. 3. Email items 1-2 above to the POC no later than the solicitation close date. Primary POC: Contracting Specialist Courtni Strickland c1strickland@blm.gov
From Solicitation posted on Aug 20, 2025Notice history
2-
-
Solicitation LATEST Posted Aug 20, 2025View changes (3)
- Title: BLM-CO GJFO 18RD EVENT AREA GRADING → F--BLM-CO GJFO 18RD EVENT AREA GRADING
- Description: Description was updated
- Response Deadline: Aug 26, 2025 → Aug 20, 2025
Details
Award Information
Not yet awarded
Documents
7Contacts
Phone
0000000000
Agency
Place of Performance
Grand Junction, Colorado 81506
USA